My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/10/2024 CAPITAL IMPROVEMENT PROGRAM Minutes
>
01/10/2024 CAPITAL IMPROVEMENT PROGRAM Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2024 5:00:29 PM
Creation date
1/22/2024 4:18:22 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CAPITAL IMPROVEMENT PROGRAM
Meeting Document Type
Minutes
Meeting Date
01/10/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
*APPROVED 1-18-2024* Capital Improvement Program Committee Minutes January 10,2024 <br /> School Safety Security it KCC <br /> Laurent:This product would go on the first floor windows of the Coombs School and would delay an <br /> intruder and prevent shattering; the estimated cost is $45K. <br /> Collins: Has this had already been installed? DeBoer: This is already in process at QS and MMHS as there is <br /> not as much glass as there is at the Coombs School so the cost was under the $25K threshold for CIP. <br /> Collins: Does it interfere with Police and Fire communication?School Finance Director Ashley Lopes: The <br /> School Department is in communication with Police and Fire <br /> DeBoer: It is a 3M product used instead of bullet proof glass which is very expensive. <br /> Collins: I am certainly not against it, but we need to make sure that the Police and Fire Departments are <br /> informed to make sure that they can communicate with people in and out of the building. <br /> Lopes:This system is used around the Cape at other schools. <br /> Community Building Needs Assessment Recreation Revolving Account Funding <br /> Laurent:This is the first step at looking at real numbers for a Community Building that would be funded <br /> through recreation revolving account at approximately$40K for a needs assessment, site selection and <br /> conceptual design of the building. <br /> McKelvey: Asked Recreation Director Mary Bradbury how this would affect the Recreation revolving <br /> account? Bradbury: The revolving account is user fee based and there is a healthy balance now. This has <br /> been on her CIP for 10 years, design and components on it, reflect on needs of a true Community Center <br /> Cotton: Location? Laurent: Part of the conceptual design is site selection. <br /> Cotton: If this is built then the Town could sell or repurpose current Kids Klub and Offices on Rt 130. <br /> DeBoer: Should be built near elementary schools. <br /> John Livingston: Would there be a pool? Bradbury: A pool is probably not feasible. <br /> McKelvey: Would operating costs be included in the needs assessment? Laurent: Not necessarily, the next <br /> phase would determine that. <br /> Don Myers (School Committee member)—This project has been in the CIP plan for many years—Needs <br /> Assessment should be done and it would be a policy decision of the Select Board for the "Use of Town <br /> Facilities" fee schedule Laurent: For instance the School Rental Fund was used for the reupholstering of the <br /> seats in the MMHS auditorium. Myers: This is an opportunity for revenue generation. <br /> Laurent:This type of building is not a huge revenue source—serve community FIRST <br /> McKelvey: This is just essentially an assessment/ needs analysis for FY25. <br /> Don Myers: This would allow the Town to go back to a centralized voting location—rather than the three <br /> used now. <br /> Heritage Park Improvements Phase 11 CPC proposed funds <br /> Laurent: Submitted to Community Preservation Committee (CPC) for$70K. Town Counsel issued opinion <br /> that CPC projects need to go through CIP. This has been in the CIP plan. <br /> DNR Boat/Equipment Storage <br /> Laurent:The Town purchased Mercantile Way site for the Natural Resources Department (DNR) but it is <br /> limited in terms of storage, etc. DNR has been using the old skateboard park behind Police Station, but <br /> there are no utilities, and if the Town constructs a new Police Station that spot is gone.This facility could be <br /> built off of Red Brook Road and we have $30 K left over from prior CIP projects that could be repurposed <br /> for this fenced in area with water and electricity. <br /> McKelvey: What about concerns about DPW Wash facility? Laurent: There would be gravel bioretention <br /> around the perimeter, and big cleaning jobs would be done at the DPW Wash facility. <br />
The URL can be used to link to this page
Your browser does not support the video tag.