Laserfiche WebLink
MASHPEE ZONING BOARD OF APPEALS <br /> MEETING MINUTES <br /> JULY 279 2022 <br /> Mr. Bonvie reiterated that the applicant is not seeking any relief from setbacks, and meets the <br /> minimum setbacks.As one member of the Board,he believes the applicant has given a very good <br /> i comprm i o se n reference to the trees,and answered the questions brought before them. <br /> Mr. Bonvie confirmed that there was no peer review because most of the comments were <br /> minimal from the Plan Review Committee. <br /> Mr. Bonvie mentioned that the Board should have a discussion regarding peer review to address <br /> any future projects before the LB A. <br /> Mr. Goldstein made a motion that the Board approve 68 Mercantile Way, Petitioner, Daniel <br /> Hostetter requests a Special Permit under §174-24 (C}, and §174-25 (G) (14) of the Zoning <br /> Bylaws to allow for construction of a 9,972 sq. ft. metal building with contractor bays on <br /> property located in the 1-1 and Light Industrial Overlay District, Map 88 Parcel 91, Mashpee, <br /> MA (Owners of Record: Timothy E. and Cheryle R. Tuttle, Trustees), with the following <br /> conditions; <br /> 1. The Board has determined that the applicant meets all the conditions of a Special Permit <br /> under Mass General Law 40A Section.9. <br /> 2. Plan Set — Proposed Contractor Bays, 68 Mercantile Way, Mashpee, M.A. Applicant: <br /> Daniel Hostetter,Prepared by: Baxter Nye Engineering, Scale,-, As shown,Date: May 17, <br /> 2022, Drawn by: JKL, Sheet No: CO.0 Cover Sheet, CIA., Legend and General Notes, <br /> C2.0: Existing Conditions Plan, C3.0-, Site Layout Plan, C3.1: Tower Truck Turning <br /> Template Plan, C4.0: Grading & Drainage Plan, C5.0: Utility Plan, C6.0,- Details Plan., <br /> C6.1:Details Plan,C6.2:Cultec Details Plan. Stamped and signed by:Matthew W.Eddy, <br /> No.: 43183 Registered,Professional Engineer. <br /> 3. Building Plans:Project.Contractor Warehouse Bays,68 Mercantile Way,Mashpee,MA. <br /> General Contractor: Capewide Construction., Inc., Date issued: 5/06/2022, Dwg Scale: <br /> I/K = I'_V. Sheet No.: A-1 Ground Floor Plan, A-2: East Elevation, North.Elevation, <br /> South Elevation, West Elevation. <br /> 4, Conditioned on all. Town. Department comments read into the record including but not <br /> limited to a letter. from, the Board of Health dated 7/18/22, and a letter. from DKM&G <br /> dated 7/20/22. <br /> 5. Conditioned on all comments submitted from Plan Review dated May 17,222, <br /> 6. Conditioned that the applicant install.white pine trees 8 ft. apart, 8 ft.tall along the north <br /> border within the 10 ft. zone. <br /> 6 <br />