Laserfiche WebLink
MEETING MINUTES <br /> MASHPEE ZONING BOARD OF APPEALS <br /> MAY 22, 2024 <br /> The structure itself has a few non-conformities. The lot coverage is 43.7%, the front yard setback <br /> is 18.6 ft. (which is non-conforming), and the side yard setback to the north is 7.4 ft. (which is a <br /> non-conformity). The shed is greater than 100 sq. ft. which is only 7.6 ft. off the lot line which can <br /> be considered a non-conforming condition as well. The project will be to raze the existing non- <br /> conforming structure and replace it with a flood zone compliant structure. <br /> The front yard setback will be eliminated and will become a conforming condition. The north <br /> setback will be improving. The current non-conformity is 7.4 ft., and will improve to 13.2 ft. The <br /> lot coverage will increase and will remain non-conforming, however as a percentage of the total <br /> lot area it will be 25%, and will be conforming to account for the total lot area. The two sheds will <br /> be removed from the property. The rear setback which is non-conforming from the shed will <br /> become a conforming condition. There are some components for the Board to consider to approve <br /> this project. This residential zone requires two parking spaces. The site plan depicts a drive way <br /> to provide two vehicles. There are no new non-conformities being created, and that this project is <br /> not substantially more detrimental to the neighborhood than what currently exists. There will be <br /> an I/A System being installed, dry wells are being installed to contain storm water onsite, and this <br /> project was approved by the Conservation Commission. The house will remain a two bedroom. <br /> This house is consistent with other projects in the neighborhood that were approved by this Board <br /> in the past. <br /> Mr. Ganzenmuller read the Board of Health comments into the record; "Facility is in a Zone II <br /> and is deed-restricted to 2 bedrooms previously permitted by the BOK Septic design plan for <br /> proposed new I/A system to be reviewed upon submission to the BOK Rodent inspection required, <br /> with abatement, if necessary. " <br /> Mr. Ganzenmuller read the Conservation Department comments into the record; "Conservation <br /> Department comments; this project was approved by the Conservation Commission at their May <br /> 9Lh public meeting. The project meets the applicable performance standards under Ch. 172, <br /> Regulation 25 (Land Subject to Inundation from Coastal Flowage)for a landlocked lot within the <br /> AE flood zone. New home is compliant with building code in the flood zone. Improved storm water <br /> runoff capture and overall reduction of impervious surfaces on the property. No other wetlands <br /> within 150 feet(wetland buffer zone) of the project site. Commission required the planting of 3-4 <br /> native trees as mitigation for the minor expansion of home footprint. The property owner will <br /> work with Concom staff to determine appropriate tree species and locations. " <br /> Mr. Bonvie asked for comments from Mr. Morris. Mr. Morris stated that he disagrees that the 97 <br /> sq. ft. shed should be considered being a non-conforming condition to the side setback because a <br /> 5 ft. setback is allowed, and is conforming. <br /> Attorney Kirrane stated that both sheds are being removed, but the proposed structure is 15.5 ft. <br /> so will become conforming irrespective of the sheds. <br /> 2 <br />