Laserfiche WebLink
Mr. White, the applicant references Mr. Cooks question pertaining to pilings or a <br /> concrete foundation wall. He adds there will be digging involved for both options and the <br /> potential to hit groundwater. <br /> PUBLIC COMMENTS <br /> There are no public comments. <br /> Motion made by Mr. Cook to deny the application (without prejudice)for 425 <br /> Monomoscoy Road because it does not meet regulation 25-C-4 standards. Motion seconded by <br /> Ms. Thornbrugh. <br /> DISCUSSION <br /> Additional discussion ensued between the commissioners pertaining to the next steps in <br /> the process, the party responsible for drafting the denial letter, and the applicant suggesting a <br /> resolution. The Agent commented on the provisions on vertical walls as it relates to the proposed <br /> home foundation and believes the proposal meets the applicable standards under Reg. 25-C-4. <br /> Agent stated that in the event of a denial vote by the Commission,he would defer to the <br /> commissioners who would vote to deny this project, to draft the denial narrative. Additional <br /> discussion and clarification ensued <br /> • Roll Call: Ms. Thornbrugh (Yes), Mr. Cook(Yes), Ms. Godfrey (Yes), <br /> Ms. Copeland (No), Ms. Clapprood (Yes), Mr. Colombo (Yes). <br /> The motion passes (5-1) for a denial without prejudice. <br /> Documents provided: Cape &Islands Engineering, Inc. Notice of Intent application and project <br /> narrative 04/30/24 Plan"Site & Septic Plan (increase in flow)" <br /> 6:48 <br /> NOI 43-3268 <br /> 14 Capstan Circle, Robert P. McDonald, Jr. Tracy A. McDonald. Proposed raze and <br /> replace of an existing single family dwelling, associated appurtenances, new title V septic <br /> system, landscaping, utilities & other associated work. Rep: Bayswater Development, LLC. <br /> (Cont. 2115, 3121, 4118) <br /> Arq"ll: a�ulid to iou ii lily l.x°ias lld Howag7 ,;, (,AF Rood <br /> Lo kud,, and land tioi,ide� i oM:e,ar, <br /> Mr. Dibb, accompanied by Atty Franklin, informed the Commission that a supplemental <br /> letter and an updated plan have been submitted for their review. The revisions made are as <br /> followed: <br /> 1. New Mitigation Proposal: The proposed mitigation efforts are now spread out evenly at <br /> the waterfront. <br /> 2. Groundwater Update: Groundwater measurements indicate a slight decrease in levels. <br /> 12 <br />