My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/09/2024 CONSERVATION COMMISSION Minutes
>
05/09/2024 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2024 5:00:38 PM
Creation date
6/24/2024 3:16:46 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
05/09/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
NOI 43-3285 <br /> 126 Shore Drive West, Heather Conway. Proposed construction of stairs to access <br /> beach. Rep: Merrill Engineers &Land Surveyors (Cont. 4118) <br /> Oa� N, T"f�I S u� s I I ab a <br /> Mr. Santos, accompanied by Mr. Jenson, presented the Commission with revisions to the <br /> plan based on discussions with Conservation Agents. These revisions address the design of the <br /> stairs and a proposed labeling system for easy cleanup in case of storm damage. <br /> 1. The homeowner agrees to have a representative inspect the stairs after a storm and <br /> conduct any necessary cleanup. <br /> 2. Site visits will also be conducted at the town's request, including follow-up with a <br /> Conservation Agent. <br /> 3. Supplemental documents provide details on the structural design rationale. <br /> 4. Natural Heritage has imposed a condition restricting construction to avoid the nesting <br /> season (April I st to August 31 st). <br /> COMMISSIONERS COMMENTS <br /> The following items were discussed regarding the staircase construction: <br /> 1. Labeling: Mr. Colombo inquired about the labeling specifications. Mr. Santos <br /> explained that labels will be placed on the first landing and the stringers/bucks on <br /> the last section of the staircase going down. <br /> 2. Construction Location: Ms. Thornbrugh expressed concerns about the location of <br /> the construction. Mr. Santos assured her that all construction will be done upland, <br /> with the bucks being built off-site. Additionally, all building and digging will be <br /> done by hand. <br /> 3. Pool Water Disposal: Ms. Clapprood suggested adding a condition that addresses <br /> the disposal of pool water. <br /> AGENT COMMENTS <br /> Mr. Kent presented the details of the revised design, emphasizing the project's benefits. <br /> He also addressed concerns about ongoing maintenance by guaranteeing a property manager will <br /> be available year-round to inspect the site. Additionally, Mr. Kent will request that the property <br /> owner or management company conduct site visits within a reasonable timeframe after any storm <br /> event. <br /> Mr. McManus recommends a close and issue with the following conditions: <br /> 1. Incorporation of all Natural Hertiage conditions. <br /> 2. Incorporation of all the protocols relating to storm damage <br /> assessment and repair and identification of structural elements of <br /> the proposed stairway. <br /> 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.