Laserfiche WebLink
Mr. Hagist asks for clarification on the slope height, which is .02 ft. <br /> Mr. Virgilio opens the meeting for a vote. <br /> Motion made by Mr. Livingston accept the new septic regulation number 16 for <br /> erosion control as submitted by the health director. Motion is seconded by Mr. Raposa. <br /> • Roll Call: Mr. Livingston (Yes), Mr. Raposa(Yes) Mr. Virgilio (Yes). <br /> Motion passed unanimously. <br /> Mr. Virgilio closes the hearing meeting and opens the public meeting. <br /> Documents provided: Revision to Septic Permit Requirement Regulations; addition of <br /> section 16: Erosion Control. <br /> OLD BUSINESS <br /> There is no old business. <br /> NEW BUSINESS <br /> 1. Review and approval of meeting minutes —Regular Sessssion May 15, 2024 <br /> Motion made by Mr. Raposa to accept the minutes as presented. Motion <br /> seconded by Mr. Livingston. <br /> Roll Call: Mr. Livingston (Yes), Mr. Raposa(Yes), Mr. Vigilio <br /> (Yes). <br /> Motion passed unanimously. <br /> 2. Review of request of variance from Mashpee Local& State Regulation — 104 <br /> Lakewood Drive, Brian Yergatioan —BSC Group <br /> Representative Mr. Hagist, from BSC Group is present to answer any <br /> questions regarding the project. <br /> AGENT COMMENTS <br /> • The property is situated in zone 2 and is 1000 feet away from a <br /> waterway. <br /> • Zone 2 state regulations specify 1 bedroom per 10000 square feet. <br /> • They are requesting 4 bedrooms in a 13000 square foot lot. <br /> • Being 1000 feet from the waterway triggers the local regulation for an <br /> I/A system. <br /> • The property is located in phase 2 of the town sewer plan and a <br /> variance is sought to avoid installing an I/A system as the sewer plan <br /> is anticipated to be completed in 2 years. <br /> • In the event the variance is denied, a nitrogen agrigation plan for <br /> 30000 square feet of the property and installation of an I/A system will <br /> be required. <br /> • A signed letter from the Wastewater Superintendent confirms their <br /> intention to complete the sewer within the next couple of years. <br /> • The town has greenlit phase 2 of the sewer plan. <br /> 2 <br />