My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/13/2024 CONSERVATION COMMISSION Minutes
>
06/13/2024 CONSERVATION COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2024 5:00:39 PM
Creation date
7/29/2024 8:49:51 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
CONSERVATION COMMISSION
Meeting Document Type
Minutes
Meeting Date
06/13/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
"squishy" area, and the area between the existing rock wall and the proposed vertical wall <br /> would be better protection to the property in general. <br /> • The Commissioner states the difference in the location of the vertical wall between the <br /> licensed plan and submitted proposed plan. He requests clarification for the discrepancy. <br /> o A survey of the site was completed, which showed the existing fence is a couple <br /> of feet shy from the property line. Therefore, the proposed plan reflects what is <br /> currently on the site. <br /> • Clarification is requested on the reasoning as to why the construction access roadway is <br /> on the plan? <br /> o The representative details the process and method for building the wall and the <br /> process for anchoring the barge. <br /> PUBLIC COMMENTS <br /> There are no public comments. <br /> AGENT COMMENTS <br /> - The agent inquires about the deteriorating piling holding up the pier and whether it will <br /> be replaced. Mr. Borselli confirms that replacing the piling is part of the plan to rebuild <br /> the walkway. <br /> - The agent also brings up the need to discuss the details required for upland access and <br /> asks about material storage procedures. Mr. Borselli is unable to provide an answer and <br /> suggests that the contractor should clarify this. <br /> - It's noted that the existing stone seawall and pier are licensed Ch. 91 structures (license# <br /> 13541). The proposed replacement bulkhead must undergo review by Ch. 91 following <br /> the issuance of an order of conditions. <br /> - The plan includes a new bulkhead proposed just seaward of the existing stone seawall. <br /> The existing stone wall and proposed bulkhead will be backfilled with clean fill. <br /> - There's a need for more details on the area of bulkhead returns where the proposed wall <br /> meets with abutting properties. <br /> The Agent recommends close and issue with the following conditions: <br /> 1) All construction work, materials, and equipment storage to be conducted from <br /> the water, with no upland construction access or staging within 75' upland of <br /> the saltmarsh. <br /> 2) Incorporate any comments from the Division of Marine Fisheries into the <br /> local order of conditions. <br /> ❖ Further discussion took place, leading to the decision to ask for a continuance. <br /> ➢ Board of Health: Note the location of the septic system and restrict equipment/vehicle <br /> traffic over non-load bearing (H-10) components. Access to septic components must be <br /> maintained. <br /> ➢ Building: No comment. <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.