Laserfiche WebLink
UPDATES <br /> AGENT COMMENTS <br /> • Red Brook Road Culvert (Waquoit Bay Research Reserves— grant assistance) <br /> • Upper Quashnet Restoration—No new updates, <br /> • Bylaw Review Subcommittee— Discussion on Regulation 25 draft performance <br /> standards. <br /> • Johns Pond and Santuit Pond Milfoil—No new updates. <br /> • Chop Chaque Bog Restoration— Finalizing construction bid package and plans. <br /> • Local Comprehensive Plan—No new updates, <br /> • Herring Warden—Herring count season ending June 14th, 2024 <br /> • Harbor Management Committee— Ongoing review of draft Harbor Management Plan <br /> • Mashpee River—Data collection phase has begun for the creation of a conceptual <br /> restoration plan. <br /> • Santuit Pond Fish Ladder— Meeting scheduled on June 14th, 2024, with NRCS and <br /> Mashpee Wampanoag Natural Resources to review conceptual designs for the new fish <br /> ladder. <br /> • Guided Nature Tours—June Schedule. <br /> COMMUNICATION/CORRESPONDENCE <br /> • June 20, 2024 DEP—An onsite appointment has been scheduled to discuss the <br /> superseding order of conditions at 84 Punkhorn Point at 11:00 am. The current attendees <br /> are Mr. McManus and Mr. Kent. <br /> • New Seabury Golf Course (Kevin Taylor) - The cart path along various sections of the <br /> golf course, especially between the loth and 15th holes, is inaccessible due to wetland <br /> overflow and flooding. The flooding has caused the cart path to deteriorate, and an <br /> erosion mat on the temporary path has been suggested. The temporary alternate path has <br /> become hazardous, and the suggestion to make it permanent by adding hardpack and <br /> elevating it has been made. Creating a new path is not feasible due to space constraints. <br /> Short-term solutions such as pumping water out of the wetland and into another nearby <br /> wetland have been proposed, with concerns raised about the environmental impact. <br /> Additionally, a long-term solution involving the installation of a wood bridge in the area <br /> has been suggested. <br /> DETERMINATION <br /> 0 1. The plan is to pump water from one wetland to a another nearby wetland in the <br /> short term, with an update in August or September to find out the status of the <br /> pumping and if there are any new plans for a long-term solution. <br /> 0 2. An administrative approval will be drafted for New Seabury Golf Course if the <br /> Commission approves. <br /> 0 3. The Agent suggests determining a long-term solution by late fall/winter. <br /> 4 <br />