My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/16/2024 SEWER COMMISSION Minutes
>
07/16/2024 SEWER COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2024 9:05:58 AM
Creation date
8/2/2024 8:56:18 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SEWER COMMISSION
Meeting Document Type
Minutes
Meeting Date
07/16/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />A motion was made by Catherine Castaneda to nominate Al Towle as Vice-Chair of the Sewer <br />Commission. <br />Motion seconded by Meredith Harris. <br />Motion passed by unanimous consent. <br /> <br />A motion was made by Vice-Chair Harris to nominate Catherine Castaneda as Clerk of the <br />Sewer Commission. <br />Motion seconded by Al Towle. <br />Motion passed by unanimous consent. <br /> <br />WASTEWATER SUPERINTENDENT UPDATE <br /> <br />Jared Meader distributed Warrant Article Placeholders to the Commission. <br /> <br />The first Article Placeholder pertains to the Staffing Plan and is a request to create and fund a <br />full time Facilities Wastewater Operator. This position is necessary to operate and maintain all <br />municipal assets within the Department of Wastewater Management and to ensure compliance <br />with the Town’s Discharge Permit. <br /> <br />The next Placeholder is to request the creation and funding of a full time Facilities Lead <br />Wastewater Operator within the Department of Wastewater Management and to ensure <br />compliance with the Town’s Discharge Permit. <br /> <br />The next Placeholder is a request to utilize funding previously approved under Article 19 of the <br />FY22 May Town Meeting for a groundwater recharge evaluation in the Waquoit Bay watershed <br />to identify a future location to safely and responsibly discharge highly treated wastewater <br />collected in the watershed. <br /> <br />The next Placeholder is to see if the Town will vote to transfer a sum of money not to exceed <br />$150,000 from revenue available for appropriation to fund an evaluation of siting wastewater <br />collection, recharge and treatment facilities in the Waquoit Bay watershed area. <br /> <br />The next Placeholder is to see if the Town will vote to transfer a sum of money not to exceed <br />$45,000 from revenue available for appropriation to fund an evaluation of two existing <br />wastewater facilities in Town to determine if it would be financially advantageous for the Town <br />to convert to municipal assets. <br /> <br />5 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.