My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/14/2024 ZONING BOARD OF APPEALS Minutes
>
08/14/2024 ZONING BOARD OF APPEALS Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2024 5:00:19 PM
Creation date
8/30/2024 12:50:50 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
Minutes
Meeting Date
08/14/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MASHPEE ZONING BOARD OF APPEALS <br /> MEETING MINUTES <br /> AUGUST 14, 2024 <br /> 6. The Board finds that the proposed project under §174-17 and §174-33 is not substantially <br /> more detrimental than the pre-existing, nonconforming structure or use to either the Town <br /> or the neighborhood. <br /> Mr. Ganzenmuller, second yes, <br /> Mr. Furbush, yes, <br /> Mr. Blaisdell, yes, <br /> Mr. Goldstein, yes, <br /> Mr. Bonvie, yes. <br /> All were in favor to issue a Written Finding. <br /> 54 Kim Path: Owners John J. and Christine S. Mizzi request a Special Permit under §174-17.1 <br /> and§174-33 of the Zoning Bylaws to raze and replace a pre-existing,nonconforming single-family <br /> structure on property located in the R-3 and Popponesset Overlay District(s), Map 117, Parcel 96, <br /> Mashpee, MA. <br /> Sitting on this hearing are the three regular Board members, and Associate Members, Mr. Reidy <br /> and Mr. Milbury. <br /> Attorney Christopher Kirrane represented the homeowners for the raze and replace project located <br /> at 54 Kim Path. The Popponesset Overlay District dimensional requirements are 6,000 sq. ft. of <br /> lot area, 60 ft. of frontage, 25 ft. front yard setback, and 15 ft. on the side and rear setbacks, 25% <br /> lot coverage, and a 50 ft. setback from wetlands, and a 30 ft. height restriction. <br /> This project has four nonconforming conditions. The lot is completely within the flood zone, so it <br /> has zero sq. ft. of lot area based of the new flood zone regulations. The other nonconforming <br /> existing conditions; 7,125 sq. ft., lot area, 50 ft. setback from wetlands, 100% lot coverage, and <br /> the southwesterly side yard setback is currently 13.4 ft. <br /> The existing structure coverage is 7,125 sq. ft. and is currently 20.8% lot structure coverage. The <br /> structure coverage will increase to 287 sq. ft., and will increase to 24.83% which is still under the <br /> 25%requirement. The southwest side yard will improve from 13.4 ft. to 14.5 ft. There are no other <br /> nonconformities being created. <br /> Attorney Kirrane noted the future improvements that will be constructed on the lot, and will not <br /> result in a condition that is substantially more detrimental than what exists. <br /> Mr. Reidy read the Board of Health comments dated August 9, 2024 into the record; "Septic <br /> submitted to zoning shows upgrade of septic with EA technology. 3 bedroom. Doors cannot be put <br /> on "Loft". Septic plan must be submitted to Health Department Permiteyes,for official review, <br /> when Building permit is pulled. " <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.