My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/25/2024 ZONING BOARD OF APPEALS Minutes
>
09/25/2024 ZONING BOARD OF APPEALS Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 9:09:40 AM
Creation date
10/11/2024 12:41:20 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
Minutes
Meeting Date
09/25/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MASHPEE ZONING BOARD OF APPEALS <br /> MEETING MINUTES <br /> SEPTEMBER 25, 2024 <br /> There are four nonconformities that exist on this property. The lot size is 14,603 sq. ft., and is <br /> partially in the flood zone with 2,649 sq. ft. of lot structure coverage. The existing property fronts <br /> both Popponesset Island Road, and Taffrail Way which is nonconforming because it does not meet <br /> the 40 ft. setback. There is a setback of 22.1 ft. from Taffrail Way, and 22.2 ft. from Popponesset <br /> Island Road. There is a rear yard setback nonconformity from Taffrail Way at 11.8 ft. The lot <br /> coverage nonconformity is 91.6% due to the impact of the flood zone, and the setback from <br /> wetlands is zero. <br /> The total lot percentage structure coverage is currently 16.6%, and will be increase to 18.1%. The <br /> stairway is conforming to the rear yard setback from Taffrail Way, and Popponesset Island Road. <br /> There is no intensification of any nonconformities except for lot coverage but is still below the <br /> 20%requirement. The proposed screened porch will be 34 ft. from Taffrail Way where the house <br /> is currently 22.1 ft. which is pre-existing, nonconforming. <br /> The project was approved by the Conservation Commission. There is a leaching chamber for any <br /> water runoff. There are no new nonconformities being created. The additions are minor that consist <br /> of a stairway, and a screened in porch and deck. <br /> Mr. Reidy read the Board of Health comments dated September 23, 2024 into the record; <br /> "Screened in Porch only. No increase in bedrooms, house to remain 3 bedroom" <br /> Mr. Reidy read the Board of Health comments dated September 13, 2024 into the record; <br /> "Resource Areas: Buffer Zone to Coastal Bank&LSCSF. NOI application was approved with a <br /> unanimous vote due to 1,227 square feet of mitigation plantings and 1,743 square feet of <br /> restoration plantings for a total of 2,970 square feet of new plantings. All new plantings will <br /> enhance the values of all resource areas/buffer zones onsite. Following conditions were applied <br /> to the NOI approval: Three (3) maintenance and monitoring contract with a certified professional <br /> for all mitigation and restoration plantings." <br /> Attorney Kirrane provided a photo of the existing area that will become a screened in deck. <br /> Mr. Dibb explained that both decks will be screened. The new covered porch will prevent damage <br /> from water runoff, and the mitigation will benefit the new homeowners. <br /> Mr. Morris asked if the deck is being expanded. Attorney Kirrane said that the elevated deck will <br /> be extend out, and the lower deck will be screened. <br /> Mr. Reidy read a note on the site plan depicting"patio,roof and rinse station to be connected" and <br /> asked what will be the connection. Mr.Dibb said that it will be connected to the infiltration system. <br /> Chairman Bonvie wanted to know the lot coverages. Attorney Kirrane said that under the "old" <br /> explanation it is 16.6%to 18.1%, and under the flood zone it is 91%to 100%. <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.