Laserfiche WebLink
MASHPEE ZONING BOARD OF A'PPEAI.,.S <br /> MEETING MINUTES <br /> OCTOBER 1.29 2022 <br /> Mr. 'Bonvie noticed-that the site plan did not have the correct dimen.s.1ons for-the water service and <br /> main., He requested a re-vsed plan. <br /> Attorney Kirrane said, that he can have the plan revised to depict the correct water service <br /> d ng spaces imensions. Some of-the parking was renio-ved-to provide a l n oad-ing zo e. and some parki. <br /> will be remo-ved., 'rhere is no asphalt being added. <br /> The representative fi-om.Down Cape Engineering explained that the drainage systems are exiostin.g. <br /> There"s a small amount of asphalt over the entrance-way to allow:for vehiclesto enter adequately. <br /> All the catch basins are existing. <br /> The Board bad a conversation., and. Mr. . would like a revised site plan. depicting the 8" <br /> rnain'. and to make sure-the Fire Department accepts this change. <br /> Attorney Kirrane ment.ioned that there was one minor recornmendatlon'that hewould 1.1ke revised <br /> regarding"no paint stored.onsate"", and.would like-the condition to be"no,mixing of in onsite". <br /> There -were no corrmients or 'issues on this project from. any dqpartments, and there were -no <br /> comments firom the audience. <br /> Mr. Bonvie made.a motion that the Board issue a Special Permit to Pet1-t1on-er, 'WCR, '[n.c. d/b/a <br /> NAPA AutoParts Cape Cod, of 502 Main Street -under §1.74-25 E (12) and §174-25 G (6) of-the <br /> Zoning Bylaws to allow for a change of use to operate a NAPA. Auto Parts Store on property <br /> 'located in a G-2 Zoning Di.strict and Light Industrial Overlay Dist.fict, '.Map 27 Parcel 157, <br /> Mashpee, MA.. Owner of Recor& The 502 Maln, Street LLC with-the follo-wrag condit.-i-ons; <br /> L The Board has determined that the applicant meets all the cond.11.1-ons of a Special Pen-nit under <br /> 'Mass General Law 40A Section 9. <br /> 2. Site Plan .--- 502 Main St. Mash pee, MA. Prepared for NAPA CAPE COD, Date-. October 7, <br /> 2022. Scale:: I"=20' Prepared by Down.Cape Engineerin& Inc. Sta iped and, signed.by Da <br /> n <br /> Ojala, PE, PLS. <br /> 3. Turning Entrance Sketch Plan of 502 Main St. -for NAPA CAPE COD,Date-. October 6, 2022. <br /> Preparedby-. Down. Cape 'Engineering, Inc. <br /> 4. Tumling 'Exit Sketch Plan of 502 Main St. for NA PA CAPE COD, Date:: October 7, 2022, <br /> Preparedby-., Down Cape Engineering, 'lim, <br /> 5. Build ing Plans—Trepared for-,NAPA,502 Main St.,Mashpee,MA.Prepare by.-CES Deep-1. n.S <br /> 9 <br /> LLC, A 1.1 Front Ele-vation., 2.1 Existing First Floor Plan,.A2.2 Proposed Floor'Plan. <br />