My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/19/1994 BOARD OF HEALTH Minutes
>
05/19/1994 BOARD OF HEALTH Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2025 5:01:13 PM
Creation date
2/28/2025 2:05:10 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF HEALTH
Meeting Document Type
Minutes
Meeting Date
05/19/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
f <br /> MINUTES May <br /> 19 , 1994 2 BOARD OF HEALTH <br /> i <br /> I <br /> 5, Perc extension recluest, 5 Wood Road - Mr. McQuaid rec- <br /> rd rant a six month extension from the date <br /> ommended the Boa q <br /> of expiration. "The new date of expiration would be June 29 , <br /> 1994 . " <br /> Mr. Doherty motioned to grant a six month perc extension <br /> from date of expiration, Mr. Cram seconded, all agreed. <br /> 6 , ) Emer enc Roa <br /> failure certification 51 Brewster d 77 <br /> Waterway and 41 Marwa <br /> Mr. Evans relayed, "I inspected all three failures and <br /> found them all in failure. " <br /> Board members forwarded their signatures to the "Emer- <br /> gency Repair Certification" forms. <br /> APPOINTMENT: Tom Howes - ' Willowbend Treatment Plant <br /> Mr. Tom Howes was in attendance for this scheduled ap- <br /> pointment. <br /> Mr. McQuaid relayed, "When Mr. Hostetter was owner of <br /> Willowbend we worked with D.E.P. extensively." "We got the <br /> Country Club going and knew the treatment plant would not be <br /> on line for a couple of years." "In negotiating with Mr. <br /> Hostetter and Mr. Howes we agreed to interim septic systems <br /> specifically, two condominium complexes and the country club <br /> complex. " "They went through the necessary engineering to <br /> establish an interim Title V septic system for these com- <br /> plexes which were D.E.P. approved. " "The are progressing to <br /> by <br /> the point now where the treatment is basically approved <br /> the D.E.P. . " "I witnessed the clear water test which is the <br /> final inspection indicating that the system is on line and <br /> running properly and I received the verbal okay from D.E.P. <br /> to that effect." "Willow is now in a position where somit <br /> e <br /> perspective buyers of individual family lots want occupancy. <br /> ,,it turns out that some of these particular homes are on the <br /> right side of Quinaquinsett Road and in order for those homes <br /> to be tied into the treatment plant calls for a pump station <br /> between that area and the treatment plant." "That pump sta- <br /> tion is not on line, therefore I will not sign-off on an oc- <br /> cupancy permit on those homes until I have proof "froMr.DHowes <br /> that the pump station is in place and operating. <br /> is present this evening to inform Board members they can <br /> handle the sewerage from those homes through a licensed <br /> pumper, " "Sewerage from those homes will flow into a pump <br /> alled to Pump <br /> station holding tank until those1�They are periodically pump <br /> that to the treatment plant. They will p <br /> that pump station holding tank. " <br />
The URL can be used to link to this page
Your browser does not support the video tag.