TOWN OF MASHPEE <br /> SENIOR CENTER BUILDING COMMITTEE. <br /> Minutes of the Meeting of March 15, 2004 <br /> Committee Attendees: Also Attending: <br /> Irving Goldberg Jim Long, Director, COA <br /> Harold Klegman Mart Sapers, FMSC <br /> Jean Noussee Bob Clark, JCA <br /> Ed Adams Bruce Taggart, Abutters' Rep. <br /> Betty Nichols Susan M. Gray, STG Consultant Services <br /> Ellis Able, Landscaping Consultant <br /> Dick&Jane Capelotti, Mashpee Garden Club Consultants <br /> Chairman Irving Goldberg called the meeting to order at 1:30 PM. <br /> REVIEW OF 3/01/04 MINUTES _ <br /> The minutes were corrected as followed: on page 2, under STUDY PROJECTS, Landscaping, <br /> change the spelling of the last name Capalati to Capelotti. The minutes were unanimously approved <br /> as corrected. <br /> GRANT ADMINISTRATOR REPORT. Susan Gray reported for the Grant Administrator that there is <br /> a new expenditure approval form. The new form is quite comprehensive. The first page itemizes <br /> Non-Construction Costs and Construction Costs, with sub-totals for each category. It also provides <br /> information about the budgeted amount, expended amount, and the balance, for each of these costs. <br /> The first page of the report also includes the Total Project Cost, total Available Budget, Sub-total <br /> Budget Deficit/Surplus minus the KeySpan grant of $7,855 giving a total budget deficittsurplus figure <br /> of minus$65,771. <br /> The second page gives a category description of outflows, with total outflow amount. Pages 3 and 4 <br /> further break down each outflow category, itemizing each expenditure by date and amount. Going <br /> forward, Joyce Mason will be preparing this approval form for the committee. <br /> Susan Gray reported that the first drawdown on the grant has come in for Statewide. She also stated <br /> that she is tracking the wage rates paid to the workers, to ensure that they are getting the guaranteed <br /> hourly wage rate. <br /> CLERK OF THE WORKS REPORT. Iry reported receipt of a bill from Clerk of the Works for$1,720. <br /> After review of the bill by the committee members, it was moved and seconded that the bill be <br /> approved for payment. The motion was unanimously passed. <br /> The Clerk of the Works has taken on a`not-to-exceed' budget. He is doing a lot of intensive structural <br /> work at the moment; including pouring the foundation. The next construction bill, which comes once <br /> a month, will be coming in on April 5"', 2004. Iry reported that the proposed site visit for the Building <br /> Committee would be delayed from the first week of April to a later date. A date will be set at the next <br /> Building Committee meeting. Design of the electric connection feed at the site is still in process. <br /> SITE MEETING—3/15/04. Iry reported that one workday was lost last week due to the snowstorm. <br /> The contractor is making every effort to move the project forward to meet or beat the scheduled mid- <br /> October completion date. <br /> Termite Control. The contractor is required to treat the soil around the outside of the building <br /> foundation for termite control. Because of the problems experienced in this area, with termites <br /> 1 <br />