Laserfiche WebLink
D • R• A <br /> • MASHPEE CENTER SITE ROUTE 151 SITE <br /> CRITERIA Issues Comments Comments <br /> ENVIRONMENTAL Former dump site and some local contamination requires Within Groundwater Protection Zone.Potentially <br /> CONCERNS further study. Loss of green space in residential part of negative impact on tare species and proposed wildlife <br /> town. refuge and portion of the site is within a designated <br /> Critical Habitat Arra.Setback required from electric- <br /> power lines. <br /> GEOTECHNICAL Some traces of former land fill and local contamination Predominately sandy soils throughout,suitable for <br /> Soils found,further investigation requited. No groundwater structure and drainage. No groundwater issues. <br /> hazardous Materia's issues identified at this time. <br /> Groundwater <br /> HISTORICAL Adjacent to traditional center of town.Some former No evidence of any former development <br /> ISSUES development including residential. Archaeological Archaeological survey requited. <br /> Archeology survey required <br /> Previous uses <br /> AESTHETIC Terraced building and site potential. Good outlooks. Buffers required at Route 151 and <br /> OPPORTUNITY Natural vegetation amenities. power lines. <br /> SBAB REVIEW Approved Approved <br /> COMMUNITY Positive potential to reinforce traditional town center in Possible relationship to library. Potential relation to <br /> IMPACT/ context with Town Hall,Archives and possible future future performing arcs complex. Secondary <br /> OPPORTUNITY developments.Secondary improvements to Noisy Hole improvement of Old Barnstable Rd.intersection. <br /> Road <br /> ACQUISITION See appraisal report.(±137 acres in 15 parcels). See appraisal report(134 acres in 6 parcels). <br /> COSTS Approximately+12%more expensive. Approximately-12%less expensive. <br /> SITE Premium Costs: Premium Costs: <br /> DEVELOPMENT Water Main: S 75,000 - $200,000 Traffic Signal: S 80,000 - $120,000 <br /> COSTS Earthwork: $100,000-$200.000 (not reimbursable) <br /> Cap@dump: S 40,000 -$120,000 Landscaping: S 10,000 -$ 20,000 <br /> Treatment Plant Design: $ 20,000-$ 50,000 <br /> SCHEDULE Topography may dictate slightly longer site Sewage treatment plant design,review,and approval <br /> Design time development period. DEP permits in place for sewer required Wildlife refuge review required. Possible <br /> Construction time treatment plant. Possible archaeology delay during archaeology delay. <br /> construction. <br /> OPERATIONAL Lower busing costs. Slightly more maintenance for Higher busing costs. Compact plan slightly, less <br /> COSTS larger areas of development andpavement, maintenance. <br /> Busing <br /> Site Maintenance <br /> • <br />