My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1994 JAN-JUN-HIGH SCHOOL BUILDING COMMITTEE
TownOfMashpee
>
Town Clerk
>
Minutes
>
SCHOOL COMMITTEE
>
HIGH SCHOOL BUILDING
>
1990-1999
>
1994
>
1994 JAN-JUN-HIGH SCHOOL BUILDING COMMITTEE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 7:15:16 PM
Creation date
11/17/2016 3:30:51 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL
Meeting Document Type
Minutes
Meeting Date
06/30/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Nantucket. <br /> Ed said they can look at the price premium for a simple pitched vs . <br /> vaulted. <br /> Joe would like to know economically what is the best way to do it. <br /> Paul suggested they explore the architectural features of both roofs . <br /> The architect' s have heard our concerns , let them explore it. <br /> He would also like to see more detail of the front entrance . <br /> Tom does not see how the ship area looks like a ship. Maybe that could have <br /> a vaulted roof also , tie it in . <br /> Ian cautioned the Committee to move the architect' s down a certain path and <br /> then bounce alternatives , otherwise you are all over the place. <br /> Science Labs : <br /> - 1 floor they can share equipment better , improves idea of identifying 1 <br /> set of labs for the junior high wing . Home economics goes downstairs where <br /> it will be used for Leisure Services . <br /> - 2 floors , they get more natural light for every room and you could divide <br /> them for the 2 grades . <br /> Bob Fournier added with all labs on the second floor , all the pipe is <br /> accessible from the first floor. <br /> ** Merry Sue made a motion that all of the science labs be located on <br /> the second floor . Steve seconded the motion . All members were in <br /> favor 7-0 . **. \ <br /> Architectural flair and character of the building . <br /> Peter and Merry Sue like the different angles of the building , even if it <br /> doesn ' t look like a boat. <br /> Ray suggested it could represent an arrowhead . <br /> Ed reiterated what he hears as the consensus of the Committee: the <br /> following provisos to be accomplished within the design development phase : <br /> - science labs on the second floor . <br /> - look at the geometry of the administration area, the entry and the newly <br /> developed entry. <br /> - look at the roof. <br /> - show the potential additions . <br /> ** Paul made the motion that the Committee direct the architectural <br /> team to proceed with this layout subject to looking at the 5 <br /> provisos just listed by Ed Frenette. Merry Sue seconded the <br /> motion . All members were in favor . ** <br /> Ian is nervous about the timing of the value management workshop . It may <br /> have to be delayed 1 week . It can be discussed further at next week ' s <br /> meeting . <br /> SITE <br /> Dan Salien explained he focused co bringing the parking nearer to the <br /> building . There is now a road running around the building , providing <br /> access to the back baseball fields , which meet the requirements of the Fire <br /> Department. <br /> There are a total of 500 spaces 300 in the north section , 200 in the south . <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.