Laserfiche WebLink
not thought of it to hire one. They are working with one in <br /> Chelsea. SMMA is providing project management services for a <br /> project in Fitchburg. <br /> Michael Pare asked who they would hire for a technology <br /> consultant? <br /> They suggest Gerry Macfey and Markison. It makes sense to use a <br /> Massachusetts group. They will make recommendations to the <br /> Committee but ultimately SMMA is responsible for the end product. <br /> They will also use the best acoustic consultant they can find for <br /> the theater. <br /> Bill Jones asked if they have the capabilities to run prices on <br /> the wish list, as it is being discussed? . <br /> Mr. Frenette said cost estimates are proportional to the <br /> information in. They have a system of cost control which allows <br /> them to analyze a system or parts of it to ensure they stay <br /> within the budget. They will provide options to investigate and <br /> alternatives. <br /> Mr. Jones explained that choices have to ge made on a timetable. <br /> He explained there will be 3 classes needing space in Sept. 1996 <br /> along with the core facilities and community operation . Is it <br /> feasible that we will have facilities adequate for 3 classes by <br /> Sept. 1996? <br /> Mr. Frenette said he defiantly thinks so. It is a catch 22 <br /> questions. Can this Committee make the decisions needed for SMMA <br /> to progress? If you take advantage of every minutes of time it <br /> can probably be done. <br /> Is there an additional cost to phased construction? <br /> Mr. Frenette said it will cost more but relative to the entire <br /> project, when it is finished, it is not a huge premium. <br /> Merry Sue Ahlgren thought the use of linoleum was interesting. <br /> What other kinds of material do they recommend and are new and <br /> interesting in school design? <br /> Mr. Frenette said it is hard to beat brick for the outside. <br /> Clapboard has a much shorter life expectancy . Interior best is <br /> usually finished or painted block. Sheet rock is more desirable. <br /> In Nantuck they used concrete pumice block, it has good <br /> acoustical absorption and it has worked successfully. For gyms <br /> traditional wood floor has again become the preference over <br /> rubber floors. <br /> Joe Polito asked if they can guarantee us a dedicated team to <br /> complete this project based on their work load now? <br /> Mr. Frenette said yes absolutely. <br /> He suggested the Committee speak with Kim Smith. One year later <br /> they are still following through on that project. They also <br /> suggested speaking with John O'Neil former Superintendent of <br /> Nantucket. <br /> Mr. Polito asked if all CAD operators were registered architects? <br /> 5 <br />