Laserfiche WebLink
protect existing vegetation is indicated , what is existing vegetation? <br /> Phil said they will identify limit of where protection takes place. <br /> - where will well and well pump be located? <br /> Mechanical - electric heating units? <br /> They will only be in the electrical closets themselves. <br /> Paul said there will be sufficient heat from the transformers, the units <br /> are a waste of money. Everyone agreed to get rid of them. <br /> - weatherproofing duct work above the roof. Will be in the specs. <br /> #18- Prevent cross-flow. Mechanical engineer will review this issue. <br /> pg. 3 1 . SMMA provide details so not to leave to contractors discretion. <br /> - Everyone agreed to eliminate drains at emergency shower. <br /> pg 6 Sink connections only? Phil said sinks will go with the laboratory <br /> work equipment subcontractor to provide better coordination. <br /> Paul said the drawings show duel connection of the water line on the site. <br /> That issue should be brought up with the Fire Chief. It is an expense the <br /> project cannot afford. <br /> PROPOSED CONSTRUCTION COST REDUCTION ITEMS <br /> Daedalus presented a revised estimate, dated 10/25 , changes included : <br /> - substructure- $35 , 502 decrease <br /> - structure- $282, 297 increase <br /> - exterior cladding- $600,000 increase <br /> - interior partitions - $231 ,866 decrease <br /> - vertical movement- $19 ,038 increase <br /> - interior finishes- $56 ,009 increase <br /> - fitting and equipment- $211 ,416 increase <br /> - electrical - $107 ,309 decrease <br /> - mechanical- $450, 073 decrease <br /> - site development- $151 , 961 increase <br /> Joel Seeley said the total decrease over the previous estimate is $944,000. <br /> Total cost starting point us $23 ,414, 559 which is an overrun of $3, 284, 559. <br /> Chartwell figured the square footage at 182 ,000. This document says it is <br /> 184,000, which Ray says is not correct. The building is on CAD, which says <br /> it is just under 183,000 sq feet. <br /> Daedalus explained their calculations were taken off by hand and he is not <br /> surprised by a small deviation like this. <br /> Ray said if you deduct the 1 ,000 sq feet cost you can reduce $200,000 right <br /> off the top. <br /> Ed asked if everyone wants to go with this estimate or come to an agreement <br /> on some amount to reduce it by? <br /> Tom Wren noted it is only a 1% deviation . It will not make an appreciable <br /> difference. Everyone can keep in mind that it is there. <br /> Bob noted there will be a variation between contractors bidding the job. <br /> The Committee agreed to work with the estimate as presented. <br /> Tom Wren highlighted Chartwell 's comments (as presented in status report <br /> 19) . <br /> The September estimate stood at $21 . 3 million after deduction of $2 .47 in <br /> value management savings from the schematic design estimate of $23 . 8 <br /> million. There is now a $3 . 28 million overrun. The Committee is looking <br /> at some hard decisions to reach the target of $110 per sq foot. The <br /> 6 <br />