Laserfiche WebLink
some security system originally. Joel said what was originally shown was <br /> window break activators and door sensors. <br /> - Classroom communicating doors - Bob said that is a direct request of the <br /> Committee. Paul said he doesn 't know of a school that doesn ' t have them. <br /> - Building Footprint assumption- Bob said the Committee made the decision <br /> they wanted this footprint and they knew it is more expensive than a block <br /> design. The premium is $200,000. <br /> Paul said "don't even try to sell me on that" ! The Committee never agreed <br /> they would accept the additional cost because of the shape of the building . <br /> If you design it you eat it. <br /> The Committee reviewed the cost reduction recommendations prepared by SMMA. <br /> Merry Sue said items 1-8 should be discussed as a package, review together <br /> how they will effect the site. <br /> Bob explained that none of these suggestions are duplicates from the value <br /> management workshop. <br /> SITE <br /> Paul noted the 10/18 estimate said both softball fields would cost $39 , 800 , <br /> this one says deleting one will save $57 ,855 . How can that be?. <br /> Joel explained this also included deleting of the clearing, grading and <br /> fill of this area. <br /> 10/18 estimate said 2 baseball fields cost $86 ,000, this estimate says <br /> deleting one will save $157 , 000 . The total clearing for the site is only <br /> estimated to cost $200 , 000. The $157 , 000 seems way off. He does not want to <br /> ;- go forth , making these decisions, if the estimates are not correct. <br /> Joel reviewed the assumptions they worked from, the cubic yard of cut x the <br /> rate. This includes eliminating the clearing of the areas all around the <br /> fields, not just the field. <br /> Dan Solien made a recommendation for the site - delete the top softball <br /> field and the lower baseball fields then the two lower practice fields <br /> could be moved up and built in the location of the lower baseball field and <br /> that leaves sufficient room for a future baseball field. <br /> Ed said even if these numbers are off, these are still significant numbers. <br /> Cutting is going to be painful but we have to begin cutting. <br /> `g The Committee agreed to remove 1 baseball , 1 softball and the 2 soccer <br /> fields associated with them. <br /> Basketball court - 1 court costs $30,00? Joel said just the bituminous <br /> r cost $17 ,000. Committee agreed to remove 1 court. <br /> Lighting - was always an alternate. <br /> Merry Sue asked how much the coin operated lighting would cost to install ? <br /> $53,000 . Lighting will remain an alternate. <br /> - Football/track stadium - Paul asked they breakdown the costs associated <br /> (pg 18 of the estimate ) . Synthetic track - $205 , 200. What other material <br /> options are there? Cinder track. Dan asked if they want to invest in <br /> installing something that will be replaced as soon as possible? Paul said <br /> they should design a track and keep the synthetic as an alternate, in case <br /> there is an extra $200 , 000 . He would rather kids leave this school with a <br /> good education ! <br /> - Committee agreed to delete the practice football field. <br /> 8 <br />