Laserfiche WebLink
the duel fuel . <br /> **The Committee agreed to take the $300 ,000 savings and investigate a block <br /> building** <br /> 6 . Delete 1 Overhead coiling door. Bob explained the custodial staff <br /> recommended this, 3 doors are too many. <br /> Paul said rollup doors require a lot of maintenance. 99% of the traffic is <br /> foot traffic. He suggested using 1 roll up and one 7x7 door. <br /> Ed said it depends on how you discipline your staff, they may use the roll <br /> up anyway. <br /> Paul also suggested eliminating the loading dock. He spoke with staff at <br /> his buildings and they agree. He suggested it be replaced with a hydraulic <br /> sizzor lift. This is not just to cut money, it functions much better. <br /> Bob said he won't get argument from them. <br /> They agreed to take $2 ,000 from #6 . <br /> 7 . Because the building is now block , this savings is now less. <br /> Agreed to take $3, 500. <br /> $442 ,000 in savings so far . $1 , 162 , 397 left to eliminate. <br /> All figures include profit and overhead . <br /> Committee went through the list again . <br /> 3 . Blinds. Merry Sue said it is difficult to darken a room to show <br /> anything on TV monitors without blinds . <br /> Committee agreed to take 1 /2 for $15 ,000 savings. <br /> 13. Entrance Door. Ed said they can do just as good a job with hollow metal <br /> but it will be a maintenance problem for sure. <br /> Committee agreed not to take it. <br /> 14. Alternate Ed operable wall . Paul said cuts have been made in the rest <br /> of the school this program for 15 students should sacrifice also. <br /> This program has 2 bathrooms at $10 , 000 each and 2 operable walls at <br /> $20,000, cuts can be made without eliminating the program. <br /> The Committee agreed to cut one bathroom and 1 operable wall for a $30 , 000 <br /> savings. <br /> 25a. Air conditioning in the remaining building. Ed said they should keep <br /> it in the library, auditorium and administration area. What else is there? <br /> Interior classroom. They need more air changes but it does not have to be <br /> air conditioning. <br /> Merry Sue said the computer rooms will need air conditioning because of the <br /> high humidity. The library has 25 computers. <br /> 37 . Bob said these 50 floor receptacles assumes we can give you a <br /> technically advanced school but it can ' t be done without the parts needed. <br /> 3 . Carpet in classroom. Paul feels it is an important element, makes a big <br /> difference in sound. Ed agrees. <br /> Bill is concerned about the health problems associated with carpet. <br /> 31/32 Will leave to the architects. <br /> Paul reviewed the specs and had some comments/suggestions : <br /> A. 4 boilers down to 2 - there will be a meeting with Paul and the <br /> engineers next week to discuss these issues. <br /> B. Main switch board could go to fuses. <br /> C. Master clock system - is it needed? Merry Sue said it is. <br /> 10 <br />