My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1994 JUL-DEC-HIGH SCHOOL BUILDING COMMITTEE
TownOfMashpee
>
Town Clerk
>
Minutes
>
SCHOOL COMMITTEE
>
HIGH SCHOOL BUILDING
>
1990-1999
>
1994
>
1994 JUL-DEC-HIGH SCHOOL BUILDING COMMITTEE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 7:15:21 PM
Creation date
11/17/2016 3:30:54 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL
Meeting Document Type
Minutes
Meeting Date
12/31/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
182
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
transmission of sound. <br /> Joe asked if vibrations are a concern? <br /> Steve does not think so. He asked all these questions to the consultants <br /> and they have answers . <br /> Paul asked about a wireless communication system? <br /> Steve said they will look at a multi channeled microphone system for the <br /> auditorium. Steve thinks it will be very cost effective. <br /> Peter asked if they talked about a public address system for the cafeteria <br /> and gym? <br /> Steve said not particularly. They are charged with the acoustics of the <br /> cafeteria and gym. That issue will be revisited . There are simple <br /> solutions to both areas . <br /> Phil said those two areas will be a PA system, not a sophisticated sound <br /> system. <br /> Paul said there are 2 categories involved: delivering sound and sound <br /> control . The Committee wants the consultant to review the plans and be <br /> able to say the "sound" is under control . The Committee will not give in <br /> on that. When the Committee made site visits sound was a major issue in <br /> most schools . The Committee should know if there is a potential problem <br /> and can then make decisions to deal with it. <br /> Janice said this is intrinsically involved with the technical consultant <br /> and .they have to work together. <br /> DESIGN ISSUES <br /> Red Block. Steve said there is a building on Rte 24 in Avon Park that is <br /> using 4 kinds of block . <br /> SMMA brought some samples of block for the Committee ' s review. <br /> They prepared a sketch of the west elevation , with block. <br /> The first 3 or 4 feet will use a rusticated base - rock face . Ground face <br /> block wI' ll be above that and accent above and below the windows. <br /> It is best to choose accent block colors when the final supplier is chosen <br /> and use test panels. <br /> They also brought a board of photographs of other buildings done in block . <br /> Ed said they feel good about the direction it is going. They are trying to <br /> provide " life" to the building . They will develop a building that is <br /> interesting at all scales. <br /> It has not been decided if the accent will be rough or smooth . <br /> Peter asked if they can reduce the amount of white aggregate in the block? <br /> Ed said they can try . It depends on who manufactures it . You will pay a <br /> premium for custom aggregate. <br /> SMMA also provided a list of buildings to visit built of block . <br /> SMMA provided samples of materials to use in place of wood. <br /> - Pre-finished composition board . It has a 20-30 year finish and does not <br /> require painting . It was used at Ocean Spray headquarters . It is slightly <br /> less expensive than cedar siding . It is said to be impervious to water. <br /> - Cement fiber board panels. Comes in smooth or rough finish . It is <br /> intended to be pained and would have to be re-coated like paint. <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.