Laserfiche WebLink
it meets the budget , they can then begin to look at life cycle benefits. <br /> During the workshop they always talked about durability and many <br /> recommendations were discarded because of durability issues . <br /> Interior Partitions - <br /> -toilet partitions -change material save $11 , 000 . <br /> - gym folding partitions <br /> a. electric folding curtain - save $112 , 000 <br /> b. standard net vinyl curtain - add $110 , 000 . <br /> Classroom corridors - circulation change - add $300 , 000 . <br /> - cafeteria doors to open outside to patio - add $16 , 000 . <br /> - elevator size and capacity change - save $5 , 000 . <br /> - eliminate wheel chairlift- save $12 , 000 . <br /> Interior Finishes <br /> - glazed face tile - reduce amount- save $320 , 000 . <br /> - curtain wall admin/cafeteria reduce by 25% - save $26 , 000 <br /> - flooring rubber tile - save $160 , 000 <br /> or quarry tile - save $53 , 000 . <br /> - stair treads- 3 alternatives and their associated savings . <br /> - gym wall to CMU save $85 , 000 <br /> - ceiling finishes in classroom - 2 choices and associated savings . <br /> - reduce quarry tile in lobby - save $11 , 500 . <br /> - no paint in service area finishes- save $7 , 500 <br /> - synthetic gym floor - save $60 , 000 . Bill suggested the Committee try to <br /> keep wood. Ray suggested looking at a lower grade of wood for savings . <br /> - corridor ceiling accent- add $60 , 000 . <br /> - classroom walls - change material $105 , 000 . <br /> - toilet room wall finish - save $30 , 000 . <br /> - ground face block in corridor walls - save $80 , 000 . <br /> Fittings and Equipment <br /> - toilet accessories - use stainless steel - add $1 , 500 . <br /> - changing lockers - delete - save $8 , 000 . <br /> - reduce team room and gym lockers - save $32 , 000 . <br /> - provide community use lockers - add $4 , 500 . <br /> Electrical <br /> - separate service for STP - save $2 , 500 . <br /> - delete emergency generator- $24 , 000 . <br /> - eliminate electric closets on second floor but it increases risk <br /> of operation <br /> - from copper to aluminum feeders - save $10 , 000 . <br /> - primary metering- owner buys equipment but will have to maintain it . <br /> There is a savings on the electrical consumption. <br /> - eliminate theatrical lighting - save $151 , 000 <br /> - multi level switch at office - delete - save $1 , 300 . <br /> - delete lighting protection- save $29 , 000 <br /> - delete satellite antenna- save $5 , 600 <br /> - combine communications systems - save $27 , 800 . <br /> Mechanical <br /> - delete compressed air in labs - save $4 , 700 . <br /> - underslabs storm and sanitary - save $4 , 400 . <br /> - duel fuel burner for hot water - add $3 , 400 . <br /> - auto flush faucets - add $4 , 900 . <br /> - auto flush water closet - add $15 , 600 . <br /> - delete fire pump - save $45 , 700 . <br /> - change sprinkler material - save $2 , 400 . <br /> 4 <br />