- HVAC- split system D% cooling- save $122 , 000
<br /> or total air conditioned- add $440 , 000 .
<br /> - indirect fired gas furnace for gym save $9 , 200 .
<br /> Site Development
<br /> - reduce student parking by 90- save $73 , 800 .
<br /> reduce faculty by 100- save $82 , 000 .
<br /> - tennis courts - reduce by 4 save $112 , 000 .
<br /> reduce by 6 save $168 , 000 .
<br /> - delete practice football field - save $64 , 900 .
<br /> - delete bleachers - save $67 , 200 .
<br /> - delete entire football area, field, track, bleachers save - $342 , 000 .
<br /> - delete 1 baseball , 1 softball , 2 soccer save $296 , 000 .
<br /> - single entry road- save $33 , 500 .
<br /> - delete irrigation system - save $112 , 000 .
<br /> - reduce landscaping by 1/3 - save $56 , 000 .
<br /> by 2/3 save 5112 , 000 .
<br /> - reduce paving and walks by 1/5 save $251 , 300 .
<br /> 1/2 save $628 , 200 .
<br /> - feature drive single lane- save $33 , 500 .
<br /> - reduce clear and grub area- save $33 , 000 .
<br /> - change material of stormwater piping- save $19 , 300 .
<br /> - change curbing to precast- save Slli , 600 .
<br /> - reduce size of parking stalls - save $84 , 000 .
<br /> - delete 3 flagpoles - save $8 , 400 .
<br /> - combine fire and domestic water- save $134 , 400 .
<br /> - reduce paving thickness- save $92 , 000 .
<br /> - eliminate parking lot islands - save $50 , 000 .
<br /> - develop drop off closer to school at no . west corner- save $5 , 000 .
<br /> - reduce on site materials for fill and subgrade - save $80 , 000 .
<br /> - cast in place concrete not pavers - save $48 , 000
<br /> - create busdrop off at fields- add $4 , 500 .
<br /> - create separate student drop off area - add $3 , 000 .
<br /> - install turning lanes at entrances - add $28 , 000
<br /> - school proximity signs - Add $1 , 000 .
<br /> - create rotary at major interchange and main access- save $80 , 000 ( from
<br /> cost of signal ) . Tom Fudala does not think it would work without land
<br /> acquisition.
<br /> - locate track and football field to NE corner - save $18 , 000 .
<br /> - restrict traffic as SE corner of the campus- save $3 , 000 .
<br /> - delete balifield lighting- save $151 , 200 .
<br /> - metal halide lighting - add $11 , 200
<br /> Planning and Programming
<br /> - delete auxiliary gym - save $350 , 000
<br /> - delete home arts suite- save $50 , 000
<br /> - delete athletic directors office- save $20 , 000
<br /> - delete multi experience lab - save $110 , 000
<br /> - building footprint - save $300-400 , 000 .
<br /> Shannon Scarlett also had some suggestions . Moving the circulation system
<br /> away from the servery and get it to the other side of the dining facility
<br /> for access to the gym.
<br /> Locate leisure services office off the main lobby, use as a secondary
<br /> reception area.
<br /> Security problem with the egress off of the main entry vestibule . Ray
<br /> 5
<br />
|