My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1994 JUL-DEC-HIGH SCHOOL BUILDING COMMITTEE
TownOfMashpee
>
Town Clerk
>
Minutes
>
SCHOOL COMMITTEE
>
HIGH SCHOOL BUILDING
>
1990-1999
>
1994
>
1994 JUL-DEC-HIGH SCHOOL BUILDING COMMITTEE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 7:15:21 PM
Creation date
11/17/2016 3:30:54 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL
Meeting Document Type
Minutes
Meeting Date
12/31/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
182
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
academic wing : they paired the windows to avoid repetition . <br /> There will be a window on each end of the classroom with wall <br /> space in between . <br /> How much more expensive is the brick? <br /> Ed said the current estimate is for all wood . <br /> For block and wood- $30 , 000 more. <br /> For all brick - $250 , 000 more . <br /> There is no question brick will out perform wood . <br /> Ed Frenette said they recommend the brick as a value add . They <br /> think it is worth it . <br /> Joe said they should add the operational costs associated with <br /> replacing the other products (wood or vinyl ) to the formula . <br /> Bill Hauck said the quality of brick today is riot good . They have <br /> to spec a quality brick . <br /> Janice asked what made them change their minds? <br /> Ed said they like the brick building but think they were overly <br /> sensitive to the cost issue . <br /> Paul asked if there is a cheaper alternative material to use on <br /> the, back side of the building . <br /> Ed said they don ' t believe there is a backside to the building <br /> but they can explore it. <br /> Ed said they plan to use a 4 x 4 x 5 brick , it makes a nice scale <br /> on a large building . <br /> Joe asked what it would cost to use regular si _e bricks? <br /> Ian said it would probably add another $50 , 000 . <br /> * Janice made a motion to accept the brick model /concept <br /> for the exterior of the high school . Paul seconded the <br /> motion . All members were in favor . ** <br /> Tom Fudala agreed the cafeteria looks weird . <br /> Joe thinks it is ugly . <br /> ROOFS <br /> The central core/shared facility area has a gabled roof . <br /> The academic wing has a shed roof . There is a different slope on <br /> an area that connects the two . That allows them to do a gabled <br /> roof. <br /> Gym (with pool shown on the this scheme ) is a positive slope roof <br /> which drains to the middle. <br /> Paul said the Committee has concerns with flat roofs . What will <br /> they do to eliminate the typical problems of a flat roof? <br /> Ed said it will be engineered to carry off any potential water <br /> that would er^d up on the roof . They will have to put overflows <br /> on it . There is no roof they can put on that won ' t require <br /> maintenance . They think this roof is reasonably maintainable and <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.