My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-HIGH SCHOOL BUILDING COMMITTEE
TownOfMashpee
>
Town Clerk
>
Minutes
>
SCHOOL COMMITTEE
>
HIGH SCHOOL BUILDING
>
1990-1999
>
1995
>
1995-HIGH SCHOOL BUILDING COMMITTEE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 7:16:08 PM
Creation date
11/17/2016 3:30:57 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL
Meeting Document Type
Minutes
Meeting Date
12/31/1995
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Paul will review it further with SMMA' s electrical engineer . <br /> SMMA presented a fee proposal for $72 , 905 for additional services <br /> to incorporate the additions to the project . <br /> Paul asked SMMA , had their estimator not told the Committee the <br /> job was $3 million high, these items wold have been in the job <br /> ( not additions ) . Why does the Committee owe them an additional <br /> fee' <br /> Joel explained , 13 of the items were deleted in the design <br /> development stage , there were no contract documents developed for <br /> them. That estimate was reviewed by SMMA, Chartwell and the <br /> Committee and by mutual consensus agreed to . The overall figure <br /> of $100 per sq foot was considered reasonable . <br /> 2 items were deleted at the schematic phase , which was even <br /> earlier. <br /> 1 item was deleted as the direction of SGS ( State ) . <br /> 2 items #12 , site accessories , and #11 , food service equipment <br /> were deleted at the contract documents stage . <br /> Paul said he is not sure you can blame Daedulas back at the <br /> earlier estimates . There were not many items removed from the <br /> final phase . <br /> Joe asked if there is any discussion to revise that figure , to <br /> one that is not as high as $72 , 000 . <br /> Steve said if $72 , 000 is the total , he does not object . <br /> Merry Sue said the project is getting $1 million of changes for <br /> $72 , 000 . <br /> Joel reminded everyone the contract documents were manipulated to <br /> allow them to purchase the list of alternates , they were not <br /> deleted . <br /> Joe asked if any conceptual work was done on these items' <br /> Paul said the $72 , 000 is based on what it will take to get the <br /> work done , on man hours , not sq footage . <br /> Joel said the contract documents will have to be modified for any <br /> work to be added. <br /> Steve said 7% fee is average . This is a hard 7% for SMMA, there <br /> is a lot of cut and fitting to be done . <br /> Wren asked it this is a <br /> Tom W is lumpsum for all the chance orders , <br /> is it a not to exceed figure? <br /> Joel said the work is in direct correlation to the list of items <br /> voted on. It is a fixed fee . <br /> Is the auditorium seating from the FF & E budget? No is part of <br /> the general contract , so is the kitchen equipment . <br /> Joel explained he was asked to contact MEPA and the Cape Cod <br /> Commission regarding issuing the additional site package early to <br /> give the information to the contractor ( in hopes of getting the <br /> best price ) . SMMA has asked for unit prices for clearing and <br /> 6 <br />