My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-HIGH SCHOOL BUILDING COMMITTEE
TownOfMashpee
>
Town Clerk
>
Minutes
>
SCHOOL COMMITTEE
>
HIGH SCHOOL BUILDING
>
1990-1999
>
1995
>
1995-HIGH SCHOOL BUILDING COMMITTEE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 7:16:08 PM
Creation date
11/17/2016 3:30:57 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL
Meeting Document Type
Minutes
Meeting Date
12/31/1995
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jim mentioned to the Committee that there are now 4 Mashpee <br /> wampanoags working on site and 8 Mashpee residents . Stone has <br /> made an effort to hire local people . The Committee appreciates <br /> that . <br /> CONSTRUCTION CONTRACT ADMINISTRATION <br /> Paul said they asked Mr . Barthelmes to address the Committee on <br /> where they stand on the job . It seems to be getting worse . <br /> Mr . Barthelmes said they had a problem getting anchor bolts . <br /> Lower Cape ( subcontractor) has just added people to the project <br /> and will be working overtime to get back on track. <br /> There is a Sept 6 deadline for seeding on the ballfields . He <br /> expects to begin loaming the late part of next week. They are <br /> currently working on the football field area. <br /> Paul said there is also an issue of getting shop drawings on <br /> time . The electrical contractor showed up on site with pipe and <br /> the installers , and wanted to do something with it . Griffin <br /> Electric is a very successful company, fast and aggressive . He <br /> has a problem with people trying to pull a fast one . <br /> Mr . Barthelmes said those shop drawings have been submitted , the <br /> process takes 21 days . <br /> Paul said there are still a lot of shop drawings due . Is there a <br /> schedule? <br /> Joel said one was submitted and returned with comments . SMMA <br /> needs them well in advance so they can return them in a timely <br /> manner. <br /> Mr. Barthelmes said they will be coming in in an orderly, timely <br /> fashion . <br /> Paul said 1 month ago Mr. Barthelmes met with the Committee , <br /> because they were behind in placing the footings , he quoted a <br /> linear footage that would be placed each day and promised they <br /> would get caught up. They are still behind . <br /> Paul explained , under the contract , the Committee can invoke <br /> their rights that require Stone to catch up, by putting more men <br /> on the job, working overtime or working a second shift . ( The <br /> Committee reviewed the section of the spec which outlines this ) . <br /> Paul said this project has to be done on time : <br /> Mr. Barthelmes said they have increased the number of workers on <br /> the site and the number of hours on the site . <br /> Paul said how- they get back to the schedule is their <br /> responsibility. They are at the second requisition and they are <br /> 10% behind. <br /> ** Paul made a motion to ask SMMA to forward written notice <br /> to the contractor involving the town' s right , under <br /> section 1 . 03 Schedule Compliance , since the contractor is <br /> 10% behind on the 60 day schedule . SMMA will decide what <br /> method they are to use to catch up . Merry Sue seconded <br /> the motion. <br />
The URL can be used to link to this page
Your browser does not support the video tag.