My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-HIGH SCHOOL BUILDING COMMITTEE
TownOfMashpee
>
Town Clerk
>
Minutes
>
SCHOOL COMMITTEE
>
HIGH SCHOOL BUILDING
>
1990-1999
>
1995
>
1995-HIGH SCHOOL BUILDING COMMITTEE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 7:16:08 PM
Creation date
11/17/2016 3:30:57 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL
Meeting Document Type
Minutes
Meeting Date
12/31/1995
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 _ _ <br /> and went over the drawings . Most of the information he was looking for was <br /> on the drawings but they did develop a list of items from his comments . <br /> SMMA has given their commitment that every item will be addressed with a <br /> response or included in the addendum. <br /> Joe said Bill Hauck wants design criteria on the drawings. <br /> Phil said they discussed that. The information the town needs is different <br /> from the information the contractor needs . He has backed off from that <br /> request. <br /> Phil said they also addressed all of Sheldon Hamblin ' s concerns ( Fire <br /> Department) but he has not been in touch with him yet. <br /> - Joe said the Committee would like to see an up to date site plan , a <br /> colored rendering of what is now in the site plan. <br /> - Tom Wren said Chartwell suggested the contractor be required to produce a <br /> schedule using a critical path method . <br /> Phil said SMMA agrees . They did not identify a software, however . <br /> - Phil gave Committee members an updated schedule. <br /> - The sewage treatment plant peer review is being completed and will be <br /> available tomorrow. Chartwell will send it directly to SMMA. <br /> Paul said the option for Cromaglass is not in there and he doesn ' t know <br /> why? <br /> Phil read a letter from Woodard and Curran which says fiberglass is not <br /> excluded . <br /> Steve does not thinks Cromaglass can do it, with this level of detail in <br /> the drawings . <br /> Phil said they designed it to a specific criteria and if a manufacturer <br /> cannot meet that criteria, it is possible they can ' t bid the job. <br /> Steve said the drawings show rectangular tanks and elevation requirements <br /> which may be a problem but they can ' t do anything about it now. <br /> - Tom Wren gave the Committee a memo outlining the costs associated with <br /> MEPA and Cape Cod Commission required studies . It has cost the town <br /> $60 ,000 . <br /> Paul asked that SMMA addressed any of the issues in "matters pending" for <br /> the next meeting . <br /> Phil said the wildlife refuge map has been faxed to Chartwell . <br /> Liquidated damages - there has been discussion between Dr. DeMoura, Town <br /> Council and Joel Seeley regarding this matter . Town Council does not want <br /> to leave it open ended. <br /> As built drawings - under SMMA ' s contract they are not required to be on <br /> CAD. The contractor provides them to SMMA. <br /> Line item break down fee for CCR and Woodard and Curran was faxed to <br /> Chartwell . <br /> Paul said he received it and it is unacceptable. The level of information <br /> was incorrect. He spoke to Joel Seeley about it. <br /> CLERK OF THE WORKS DISCUSSION <br /> Phil presented the AIA document (B352 ) regarding Clerk of the Works. <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.