My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-HIGH SCHOOL BUILDING COMMITTEE
TownOfMashpee
>
Town Clerk
>
Minutes
>
SCHOOL COMMITTEE
>
HIGH SCHOOL BUILDING
>
1990-1999
>
1995
>
1995-HIGH SCHOOL BUILDING COMMITTEE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 7:16:08 PM
Creation date
11/17/2016 3:30:57 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL
Meeting Document Type
Minutes
Meeting Date
12/31/1995
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ti <br /> Merry Sue said they have to promise to take a hard look at the FF&E budget. <br /> Paul said the Committee is not going to extend the list of alternates , they <br /> are talking about adding back in those items from the alternates list. <br /> Peter said the Selectmen don ' t have enough information to decide which <br /> alternates to put back in against the FF&E items. <br /> Joe said it is a shame the technology has to be compromised . That is what <br /> the school needs. Attention should be paid to the technology budget. <br /> Peter suggested they ask Anne Shaw to run the projections on the tax rate <br /> for the additional $2 million , per $1 , 000. <br /> Bill said the Committee assured town meeting they could deliver this school <br /> for $27 . 8 million. <br /> Paul disagrees. <br /> ** Motion: Merry Sue, Peter, Janice, Joe, Paul in favor. <br /> Steve, Bill against. <br /> Paul will meet with the Selectmen on Monday night. <br /> SMMA RESPONSE TO PEER REVIEW COMMENTS <br /> Tom Wren spoke with their electrical/mechanical engineer doing the peer <br /> review. If they could stress only 1 thing it would be the need for a <br /> speaker light for the fire alarm system in each classroom. <br /> Phil said they have already done that with an addendum. <br /> He said there is no guarantee you will get the required decibel level in <br /> the classroom from the corridor . They put a horn strobe in every <br /> classroom. <br /> (Peter left the meeting. ) <br /> Phil said all items from the peer review were respond to by SMMA; as of <br /> 2 : 00 today they were still in typing . The Committee members should have it <br /> by Thursday. <br /> The filed sub bids are due April 6th . They have up to 48 hours before that <br /> for addendum. <br /> Phil said they printed 150 sets of drawings and are out of them. <br /> Bill asked Paul if Dodge reports had any updates on construction costs? <br /> Paul said they don ' t have the last 6 months figures. He did speak with <br /> Sarah Johnson who does an economic report for a local network. She said <br /> the numbers now are reflecting the contractors adding back in for overhead <br /> and profit which they hadn ' t done for the last 2 years . Materials are only <br /> up 3-5% and labor up maybe 3%. The big number is the 15% overhead and <br /> profit. Contractors now need profit to stay in business. You cannot <br /> predict competition. With that many drawings out, it is a good indication <br /> of the discount the project will receive but discount from what is the <br /> question . <br /> Phil said he met with the Building Inspector last Wednesday fron 5-9 p .m. <br /> 7 <br />