My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-HIGH SCHOOL BUILDING COMMITTEE
TownOfMashpee
>
Town Clerk
>
Minutes
>
SCHOOL COMMITTEE
>
HIGH SCHOOL BUILDING
>
1990-1999
>
1996
>
1996-HIGH SCHOOL BUILDING COMMITTEE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 7:16:49 PM
Creation date
11/17/2016 3:31:01 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL
Meeting Document Type
Minutes
Meeting Date
12/31/1996
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Steve also would like to know how much time we have left . <br /> Dan said there are 5 weeks left before no seeding should occur this fall . <br /> After the first week of November there should be no seeding and even then <br /> you will not see results until next spring . It would be dormant seeding for <br /> germination next spring . <br /> To repair the fields : repair erosion, remove construction debris , replace <br /> loam in areas to bring the grade up to its intended level for proper <br /> drainage , till the area to provide looser soil conditions , aerate the <br /> fields to loosen the soil to create new seed beds , apply lime to adjust the <br /> ph, provide starter fertilizer, slide seed ( insert seed into a short <br /> furrow) . <br /> Dan explained he recommended dormant seeding last fall and that was ignored <br /> by Stone . On June 6th he issued a lengthy list of directives to follow <br /> immediately which were ignored. <br /> Where is the erosion? <br /> Dan said it is spotty, throughout . There are hollows and depressions <br /> created by vehicle and foot traffic. <br /> Next spring the fields should be top dressed , add a thin layer of soil over <br /> the growing grass areas to further bring them up to grade . <br /> Joe said it doesn' t look like there is much grass out there , mostly weeds . <br /> Dan said there was a plantation of sweet fern which was removed. There is <br /> not a lot of crabgrass or broadleafed weeds but there was wash out of grass <br /> seed in areas so there is spotty growth. The conditions were not created <br /> for bluegrass to grow . Bluegrass spreads like strawberries and starts new <br /> plants . There is almost no bluegrass growing out there . <br /> Dan said Stone has been give 1 year and they haven' t repaired the fields. <br /> He does not think they are willing or able . He has no reason to feel <br /> confident they will act any differently in the future than they have in the <br /> past. <br /> Paul said the Committee will need something in writing from Dan to bring to <br /> town counsel , through Joel . Paul will be asking town counsel to deal with <br /> this issue ; he does not know if we can terminate one section of the <br /> contract . <br /> Dan reviewed the AIA contract , s section reads "to suspend or delay work in <br /> whole or in part" . <br /> Joel said they will write a cumulative letter of the directions given to <br /> Stone since last fall and will request clarification on how to proceed. <br /> Dan suggested suspending work immediately because the fields are at a clean <br /> break. <br /> Paul will ask town counsel to review all the necessary items in the <br /> contract . <br /> He asked if the subcontractor has had other jobs in the area with similar <br /> problems? <br /> Dan said they worked on the Falmouth Hospital addition and the landscape <br /> architect is very dissatisfied with their work. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.