My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-HIGH SCHOOL BUILDING COMMITTEE
TownOfMashpee
>
Town Clerk
>
Minutes
>
SCHOOL COMMITTEE
>
HIGH SCHOOL BUILDING
>
1990-1999
>
1996
>
1996-HIGH SCHOOL BUILDING COMMITTEE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 7:16:49 PM
Creation date
11/17/2016 3:31:01 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL
Meeting Document Type
Minutes
Meeting Date
12/31/1996
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Peter asked how the fire detection, alarm and security systems are working? <br /> Paul said they are very sophisticated systems . The security system is <br /> operational in A, B & E but zoned out for C & D. <br /> Paul said there are a few things remaining to be done in C & D. Expansion <br /> joint plates by the locker room corridor will not arrive for 2 1/2 weeks . <br /> He described a possible alternative solution until they do arrive . Joel <br /> does not think you need the plates for building occupancy. <br /> Joel explained he has begun to punch out C & D. <br /> The acid neutralization tank is scheduled to be delivered. Tuesday. By the <br /> end of the week they can start using the science labs . <br /> Athletic Fields : Stone has hired a company from the lower Cape to do the <br /> slice seeding; they have more sophisticated equipment . They were to start <br /> Thursday but because of the rain they plan to wait until next Thursday. <br /> Steve asked if they he did the remediation work? <br /> Jim said they have done a lot of it . They have been working on the fields <br /> every day since the last meeting . Dan Solien has been here every day. <br /> Waiting until next Thurs . for the slice seeding was a joint decision of the <br /> contractor and Dan. <br /> Tom Wren asked, now that we are out of the growing season, is Stone seeding <br /> at their own risk? <br /> Joel said they have been notified that there will probably need to be a <br /> third seeding in the Spring . <br /> Merry Sue asked if this will delay the track until Spring? <br /> Paul said he and Joel have talked about the benefits of delaying the track: <br /> - the track installer needs perfect weather to put it down, at this point <br /> it is a real wild card. <br /> - if the fields don' t take , they will have to run trucks over the track in <br /> the spring to fix the fields . <br /> They will need to get a storage recommendation from the manufacturer <br /> because the materials are already on site. <br /> Peter asked if the baseball fields will be ready by Spring? <br /> Paul said we don' t know yet . The students should not play on them <br /> prematurely. <br /> John Williams said they hadn't planned on using the baseball/ softball <br /> fields this spring . <br /> Tom Wren asked about the football scoreboard? Joel asked John Williams <br /> about it at the last meeting . It is a turnkey package . <br /> Road Improvements : The poles have finally come out of Old Barnstable Road . <br /> Today they are working on the top course . The road markings and sidewalk <br /> remain. <br /> Tom explained there is still some paperwork to be completed , because of <br /> back charging for the moving of the fire hydrant (which was originally <br /> installed in the wrong location) . <br /> 2 <br />