My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-HIGH SCHOOL BUILDING COMMITTEE
TownOfMashpee
>
Town Clerk
>
Minutes
>
SCHOOL COMMITTEE
>
HIGH SCHOOL BUILDING
>
1990-1999
>
1996
>
1996-HIGH SCHOOL BUILDING COMMITTEE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 7:16:49 PM
Creation date
11/17/2016 3:31:01 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL
Meeting Document Type
Minutes
Meeting Date
12/31/1996
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Oill not get a CO. The material is not yet on site . It is due to be sent <br /> out early in November. <br /> Stone has no completion schedule for those areas that we know of . <br /> Joel said the expansion joint material is fire rated and it is for the wall <br /> at the gym. It has to be in, it is a life safety issue . <br /> Peter said assuming we get that material in soon, is the auditorium still <br /> not close to complete'? <br /> Joel responded no , it could be soon. <br /> Dr. DeMoura said the School Department has some real issues . Physical <br /> Education cannot continue outside , in the parking lot . As a school system <br /> we have to have a plan for physical education and sports practices which <br /> will have to be held at the other schools . We need to know. <br /> Peter said it is not the architects call . Stone is contractually liable <br /> for opening the building and providing us with information. What decisions <br /> are you ( Dr. DeMoura) asking us to make? <br /> Dr. DeMoura asked when they can expect to use the cafeteria and gym and <br /> related art and music suites? That information is needed to get plans in <br /> motion. <br /> Joel said to complete the punch list items from the gym and cafeteria Stone <br /> could work off school hours . It is the fire proofing material at the <br /> Tcpansion joint that is hold things up . <br /> om Wren said that Paul has been in touch with Pat Costello ( town counsel ) <br /> but he does not have the details . <br /> Dr . DeMoura said it sounds like we won' t be able to take occupancy of just <br /> the gym and cafeteria , it has to be all together. When will that be' He <br /> is not comfortable that it will even happen in November. <br /> Tom Wren said last Wednesday was a regularly scheduled owners meeting and <br /> one-half hour into the meeting Stone called to say no one from Stone would <br /> be attending. Senior Stone staff on site is infrequent . There are only <br /> about 10-12 men working in the building each day. <br /> Dr. DeMoura said they cannot keep the students outside for phys ed much <br /> longer . <br /> Steve asked what kind of money this is costing? <br /> Dr. DeMoura said it is $40 per trip between schools , they will need to make <br /> at least 6 trips per day. And then there are team practices to deal with. <br /> Peter asked if Stone is making a good faith effort to get this work done as <br /> soon as possible? This Committee should tell the Selectmen we feel Stone <br /> could be making better progress . Our attorney should make contact with <br /> their attorney. <br /> Steve asked Peter to deliver that message to the Selectmen . advise them <br /> hat town counsel should become involved . <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.