Laserfiche WebLink
Mashpee High School Project Management ChRAWSH /ANDREW CHARTWELL & CO <br /> 4.4 Change orders: see SMMA's response attached at 'Modification Procedures'. With <br /> the aim of avoiding delay to the Project, copies of draft change orders are to be <br /> provided to ACC as soon as each draft is raised. Except where otherwise requested <br /> by the Building Committee, change orders having cost or time implications, or <br /> both, will be negotiated with the Contractor by SMMA. Once a change order is in <br /> draft format, duly supported by calculations and estimates necessary to the forming <br /> of an informed opinion, ACC will review and advise the Building Committee and <br /> SMMA of the merits of the draft. Ordinarily, each final draft should be agreed with the <br /> Y � <br /> Contractor before presentation to the Building Committee for joint signature by the <br /> Owner(Building Committee) and SMMA. The intention is to use the Change Order <br /> Directive procedure sparingly. In such instances, a limit ("up-set") amount will be <br /> stated in the directive. <br /> 4.5 RFI's (requests for information) from the Contractor, if addressed to ACC/COW, will <br /> be relayed to SMMA for interpretation and decision. SMMA will follow-up with a <br /> 'bulletin' or other response to the Contractor, with a copy to ACC/COW. <br /> 4.6 Shop drawings. SMMA will maintain the master log and will provide copies to <br /> ACC/COW if requested. The Contractor is to be directed to maintain a Project log of <br /> all shop drawings and is to provide regular up-dates to ACC/COW for monitoring <br /> purposes. Materials submittals and approvals are to be incorporated into the shop <br /> drawings log. It is expected that shop drawings will be communicated by post. <br /> ACC/COW is to be provided a copy of all shop drawings and is to be informed by <br /> SMMA on the date that shop drawings are approved for construction. <br /> 5.0 Schedule of Values and Payment Procedure <br /> 5.1 The Contractor will be directed to submit the Schedule of Values within the time <br /> period as prescribed in the Specification. SMMA and ACC are to exchange views <br /> on the Schedule before acceptance is communicated to the Contractor. Every effort <br /> will be made to obtain the greatest level of detail possible from the Contractor, <br /> including the provision of materials' values. <br /> 5.2 Payment procedure. As 4.3 above and, in addition, the route for the Contrator's <br /> interim payment requisitions will be: <br /> 1. Draft to SMMA with a simultaneous copy to ACC. <br /> 2. Settlement of the draft at site: Contractor, SMMA and ACC/COW. <br /> 3. Certification by SMMA with original to ACC. <br /> 4. Recommendation by ACC to Building Committee together with submission of <br /> original certificate. <br /> Sheet 3 of 6 Administration of the Project May 4, 1995 <br />