Mashpee High School Project Management CG11 GF M OH ANDREW CHARTWELL& CO <br /> 9.2 ACC/COW will not give direction to the Contractor if matters requiring attention are <br /> observed on the site. The Contractor will merely be informed that a safety aspect <br /> needs to be addressed. <br /> 10.0 Visitors and Site Security <br /> 10.1 As the site will be turned-over to the Contractor for the duration of the construction, <br /> responsibility for visitors and site security will rest with the Contractor. <br /> 11.0 Photographic Records and Video <br /> 11.1 SMMA will inform the Contractor of the views it requires for photographic record <br /> purposes. <br /> 11.2 ACC/COW will take independent supplementary photographs as the need arises. <br /> 11 .3 Control of video cameras is a matter for the Contractor to control. <br /> 12.0 Coordination of Subcontractors <br /> 12.1 Refer to comment 7.2 above. <br /> 13.0 Labour <br /> 13.1 The Contractor's observance of the Prevailing Wage Law will be monitored by <br /> ACC/COW. <br /> 13.2 The Contractor's observance of the Prevailing Wage Law will be monitored by <br /> ACC/COW in liaison with the Town's Affirmative Action/Contract Compliance Officer. <br /> Opinion of Town Counsel is to be sought with respect to a procedure for conducting <br /> spot checks. <br /> 14.0 Assistance to Contractor in the Obtaining of Permits <br /> 14.1 Building Permit. A temporary permit has been arranged with the Town's Building <br /> Inspector. <br /> 14.2 Discharge Permit. The draft application is presently with the Town's Executive <br /> Secretary for signature after which SMMA will submit the signed draft to the DEP to <br /> commence the review period. SMMA advised that the Contractor had included the <br /> SBR design in his bid: no further problems in obtaining design approval are <br /> envisaged. <br /> Sheet 5 of 6 Administration of the Project May 4, 1995 <br />