Laserfiche WebLink
Mashpee High School Project Management ChOP4Mn O /ANDREW CHARTWELL & CO <br /> 14.3 Department of Education (SGSS) approval of State funds for the Project is expected <br /> on 8th May 1995. <br /> 14.4 The final public hearing on the DRI (environmental) report is scheduled to take <br /> place on 11th May 1995: no problems are envisaged. <br /> 15.0 Testing Agencies <br /> 15.1 ACC/COW has written to advise that it concurs with SMMA's recommendation to <br /> retain the services of UTS of Massachusetts. <br /> 15.2 SMMA are to enter into an agreement with UTS as soon as possible. <br /> 16.0 Claims: Monitoring and Management (Ref. Clause 4.3 of Contract Conditions) <br /> 16.1 ACC/COW advised that, as standard procedure, it would be monitoring and <br /> reporting on potential and actual claims to the Owner in an independent capacity. <br /> 17.0 Chartwell/Clerk of the Works' Site Hut and Facilities <br /> .17.1 ACC/COW requested assistance from SMMA in the siting of the hut, as provided in <br /> the Specification. In addition, ACC requested that its name be added to the Project <br /> sign (Spec. 01500-2.02). <br /> 18.0 SMMA's Agenda for Pre-Construction Conference <br /> 18.1 SMMA confirmed that the date of the conference remained as originally scheduled: <br /> Friday 5th May 1995 at 1 p.m. in the Town Hall. <br /> 19.0 Other Matters Arising <br /> 19.1 ACC/COW requested a copy of the signed recitals to the Contract Conditions <br /> together with a copy of the Contract sureties. <br /> Distribution: Those present; Paul Griffin -Building Committee; Ian Aitchison -ACC; Site file. <br /> t 6.5.95 <br /> Sheet 6 of 6 Administration of the Project May 4, 1995 <br />