My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/17/1984 PLANNING BOARD Minutes
>
10/17/1984 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2018 5:03:54 PM
Creation date
1/18/2018 3:14:40 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
10/17/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Tolun of �F <br /> (7 <br /> P. O. BOX 1108 <br /> MASHPEE, MA 02649 <br /> PLANNING D MINUTES : 10/17/84 Cont . Pang e <br /> Theme was a continuation of the subdivision public hearing on Deer <br /> Cross.ng from the last meeting, as Mr. Grassetti hadn't been able to <br /> produce a receipt from the Board of Health . Mr. Grassetti presented <br /> receipt this time and there were no comments From the public . <br /> Mr. Marsters rade a motion to approve the subdivision plan. Mr, <br /> Collins seconded it and all voted in favor. Mrs rassetti presented <br /> 3 copies of the covenant <br /> a d said the ill sin the plan at the nextmeeting , 1 l/' , asThe B r <br /> the 20 day appeal period will have lapsed . Mr. Gra setts took back <br /> the plans to hold . <br /> Petitioner: Meadow Haven Realty Trust <br /> Submitted by: Bill Waller <br /> Type of Plan: Definitive <br /> Location: Route 130 old Dare property <br /> Fee : 2 5 <br /> Mr. Weller presented profiles ,, definitive plan# drainage calculations <br /> and plans and a list of abuttors <br /> The Board recommended: They put a nate on the plan stating the <br /> 101 easement is not to be considered <br /> building lot . <br /> That a note be placed on the plan to protect <br /> the rights on the old wood road <br /> Mr. Rowley e felt there may be a problem with the drainage and he would <br /> look at them, <br /> The Board scheduled the public hearing for 11/21 . They paid the fee <br /> for 16 lots . <br /> Mr. Pomeroy wanted to know if the road could be completed prior to <br /> inter and if they could begin work as soon as the plan was approved <br /> ,at the public hearing and they would post a bond . <br /> The Board said yes but he would have to submit an estimate ofthe road <br /> wore to Mr. Towler for approval. <br /> Ir � <br />
The URL can be used to link to this page
Your browser does not support the video tag.