Laserfiche WebLink
July Zoo <br /> Page 6. <br /> 7:55 JAMES REBEL for partial demolition and removal of ars existing <br /> garage and the proposed construction of a single family dwelling with <br /> subsurface septic system and drive at 19 Great River Road. Mr. Lel el was <br /> represented by Hamlyn Consulting. Plans were revised with a Micro Fast <br /> system. There is 565' of natural vegetation. An existing drive is to be <br /> improved. Plan was revised on 6/21/00. The douse will be on slab. The <br /> Building Inspector has signed off. <br /> Ms Boretos advised the septic cannot go elsewhere. she recommended <br /> approval. It is within the flood plain. It is a small house on a small lot. <br /> Public comment: mono. <br /> VOTE: Motion made and seconded to close and issue. Unanimous Vote. <br /> HEARING CLOSED. <br /> 8:00 BARBARA SHAD to amend the order of Conditions for se 3- <br /> 181 to permit a revised landscape plan for 115 Popponesset Island Road. <br /> Mr, Sherman advised abutter notice was incorrect; Mr. Sheehan has <br /> requested a continuance.- It comes before as Carel Subject To Coastal <br /> Storm Flowage or within 100'. Linder the state, there are no standards but <br /> under the Bylaw there are standards re size of the lawn that -could be <br /> permitted and amount of natural vegetation to remain. He will have to verify <br /> the lawn is no more than 10% of the property under jurisdiction. Berms were <br /> added along the edge of the road and cross sections of the terracing and <br /> berms provided. The doss sections need work, they do not give the detail <br /> needed. <br /> Mr. Sherman prefaced the opening of public comment by stating the only . <br /> thing that can be taken into account is the standards of the local Bylaw in <br /> terms of environmental impacts. <br /> The Chair stated he would entertain very Brief comments and only so far as <br /> they apply to the application this evening. <br /> Martin - Solomon expressed concern whether or not the plan previously <br /> submitted has been evaluated as to whether or not they are in compliance <br /> with that. The berm that was created was created from soil brought t from off <br />