My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/16/2020 BOARD OF SELECTMEN Agenda Packet
TownOfMashpee
>
Town Clerk
>
Minutes
>
SELECT BOARD
>
AGENDA PACKETS
>
2020-2029
>
2020
>
03/16/2020 BOARD OF SELECTMEN Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2020 3:08:26 PM
Creation date
9/11/2020 2:35:35 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF SELECTMEN
Meeting Document Type
Agenda Packet
Meeting Date
03/16/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
*DRAFT 2 MAY 2020 TOWN MEETING WARRANT* Page 24 <br /> Article 30 <br /> To see if the Town will vote to appropriate and transfer the sum of$20,000 from the Waterways <br /> Improvement Fund to the Engineering/Permitting/Dredging and Associated Expense for the <br /> purpose of proviiding surveying services for the Channels to be Dredged or take any other action <br /> relating thereto. <br /> Submitted by the Waterways Commission <br /> Explanation: The Channels scheduled for dredging will require these services before and after <br /> dredging. <br /> The Board of Selectmen recommends approval of Article 30 by a vote of 5-0 <br /> The Finance Committee recommends approval of Article 30 by a vote of 6-0 <br /> Article 31 <br /> To see if the Town will vote to amend Chapter 84 Erosion and Sedimentation Control of the <br /> General Bylaws as follows: <br /> Add a new paragraph 14 to §84-4, <br /> Plan and Application R,eguirement.- <br /> 14. Description of construction waste management including discarded building materials, <br /> concrete truck washout, chemicals, litter and sanitary waste. <br /> Amend §84-5 Control Measures by adding new language/paragraphs and re-numbering <br /> accordingly,-, <br /> §84-5 Control Measures: <br /> A. Measures to prevent the erosion of soils from the property and the sedimentation of <br /> drainage structures and adjacent wetlands throughout all phases of construction and <br /> at,the completion of project shall, at a minimum, include the following: <br /> 1. Minimize the amount of disturbed area, and protect natural resources; <br /> 2. Stabilization of cleared areas within fourteen (14) days of clearing or extended <br /> inactivity in construction (fourteen (14) days or more) by planting of temporary <br /> vegetative cover, mulching, use of erosion control mats or similar measures; <br /> 3. Protect slopes on the construction site; <br /> 4. Stabilization or covering of soil stockpiles at the end of each workday, <br /> 5. Prevention of blowing of dust or sediment from the site by mulching, sprinkling <br /> (water), spraying of adhesives or calcium chloride, use of stone, particularly along <br /> construction roads, or providing wind barriers; <br /> 6. Provisions, for the maintenance of the erosion and sedimentation control <br /> measures, including protect all storm drain inlets and armor all newly constructed <br /> outlets, <br /> 7. Use perimeter controls at the site; <br /> 8. Stabilize construction site entrances and exits to prevent off-site tracking; <br /> 91. Control wastes that may be discharged, including but not limited to, discarded <br /> building materials, concrete truck wash out, chemicals, litter, and sanitary wastes <br /> (these wastes may not be discharged to the MS4- and <br /> 10. Inspect'stormwater controls at consistent intervals. <br />
The URL can be used to link to this page
Your browser does not support the video tag.