Laserfiche WebLink
The following is a summary showing the expenditures <br /> made on the various roads under Chapter 81 contract. <br /> Forestdale (Rte. 130) $731.50 <br /> Ashumet;__.,, 25.16 <br /> Falmouth' 50.00 <br /> Lovell Lane _. 457.00 <br /> Quashnet 626.00 <br /> Old Barnstable 508.50 <br /> Old Mill 849.98 <br /> Pimlico Pond 732.25 <br /> Peters Pond 174.00 <br /> Wakeby 33.00 <br /> Cotuit . 1,230.06 <br /> South Sandwich. 997.00 <br /> ;Lowell 95.00 <br /> Hatchville 52.00 <br /> Meeting House 390.24 <br /> Cemetery 59.00 <br /> Collins Lane 143.00 <br /> Great Neck 2,040.13 <br /> Popponessett 128.00 <br /> Red Brook 169.00 <br /> Lake Avenue 33.00 <br /> Seconsett 128.00 <br /> Newtown 17.00 <br /> Route 151 (Waquoit Cut-off) 186.00 <br /> Orchard 348.16 <br /> $9,499.98 <br /> I desire to express my appreciation to all the Town <br /> Officials, citizens and Mr. French, State Engineer, for the <br /> co-operation given me in performing my duties as Highway <br /> Surveyor: <br /> Respectfully submitted, <br /> EDWIN L. WHITE <br /> Highway Surveyor <br />