Laserfiche WebLink
28 <br /> Report of the Park Commissioners <br /> To the Honorable Board of Selectmen and <br /> the Citizens of the Town of Mashpee: <br /> We feel considerable progress was made in the devel- <br /> opment at Attaquin Park. A "parking area" greatly needed, <br /> 175 ft. x 85 ft. was made. Trees removed, hardening material <br /> and fill trucked in, the area cleaned and graded to a level <br /> above the Mashpee Lake. The surrounding area was cleaned <br /> of all brush, stumps removed, slopes graded and seeded. <br /> This new area proved satisfactorily but it is still not large <br /> enough to handle weekend crowds. <br /> 1, <br /> j <br /> Our original plan was to have the parking area sur- <br /> rounded with cement posts and oiled, because of limited <br /> la <br /> ' i <br /> i <br /> i <br />