My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/07/2004 PLANNING BOARD Minutes
>
01/07/2004 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2022 2:18:04 PM
Creation date
1/19/2022 11:42:44 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
01/07/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
perniit modifi ation to April 2 1, 2 004 at 7:1 pan. Steve seconded the motion.- . <br /> All members were in favor . ** <br /> At : o the Board opened the Cape Southport Associates-public hearing. <br /> Applicant: Cape Southport Assoc.LL <br /> Location: Southport ondorniniu ,.Old Barnstable Rd <br /> Request. Approval of Final.Site Development Plan <br /> ** l enni.s made..a motion to continue the Cape Southport public hearing to 7:35 pm. <br /> Steve seconded the motion. All members were in favor -o** <br /> windchime Point iscus ion Continued: <br /> Mr. Quim said this plan.is,the latest version, as proposed, with the building's-wed and waiting <br /> for Board approval to proceed with work. <br /> Eric reviewed the landscape,-plan t,a,site-visit and had.some comments. <br /> - one tree came down which should be noted on the plan <br /> 5623 and 99.,are-not on the plan <br /> - 5625 he did not see.ire the field. <br /> These changes will be incorporated,into the new plans. <br /> Torn Quinn Js wking for approval-of the,revised site plan <br /> Does the Board agree these are minor revisions.? They do agree. <br /> Charlie is concerned about some drainage at the.rear of building 43 which is close to the slope <br /> but he can work with them on adjustment to that location. <br /> There was no public comment. . <br /> s <br /> ** Don made-a-motion to approve the utility.,site plan submitted,.dated Phase,3 revised <br /> 1 2o , subject.to any suggestions;from the.,Planning Board or their-consulting <br /> engineer that would nhance the ability to sage trees. Steve seconded the%-modion. All <br /> members were in favor -o*.* • <br /> ** Dennis.made a motion to approve�the landscape plan for buildings 25,26,27,28,and. 1 <br /> as revised 1 /04 subject to Eric Smith's report which was given tolom Quinn and <br /> any additional comments from the Board consulting engineer being incorporated into <br /> the plan. Steve seconded the motion. All Board members were -favor MO** r <br /> llrir. Quinn noted that they have re eived quotes for the affordable unit that will.be building old <br /> site and hope to stare work in early spring. <br /> They need a sign off from the PI Board for Phase 2. In the past, the Board has done a walk <br /> through, as a group or individuaHy. <br /> The Board scheduled a site visit for Saturday, Januuy 17, 2004 at :00 am. <br /> Applicant: Morris Kirsner BSS' esign <br /> location: Assessors Map 67, Blocks 76 & 77 and Map 68, Blocks 104 & 10 <br /> Request: Approval of 3-lot definitive.subdivision plan. Filed April-2 , 2003. Limited <br /> discretion referral accepted b Cod Commission on-Jul 1 oo . <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.