My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/07/2004 PLANNING BOARD Minutes
>
04/07/2004 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2022 5:13:31 PM
Creation date
1/19/2022 11:57:41 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
04/07/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The Town -Planner requested a regrading plan- for that <br /> area of charge near the cat h basins. He asked who, would <br /> be responsible to- insure the- proper grading• <br /> Kr. 'Bonnie suggested an inspec ion upon completion of <br /> the regrading'. <br /> Mr. Row-ley suggested' the 'location of the basins be set <br /> with are elevation established for the rim -grade. once in <br /> place the area can be shaped and graded, taping the <br /> approach f cm the pond into consideration. Regrading <br /> ra din <br /> around the two points- of access is relatively sma,11. <br /> Mr . Bonvie agreed to prov-ide a-s-built- plans and to a <br /> final inspection by Mr. Rowley' . <br /> The 'down Planner} asked if the lands caper mill be <br /> supe vis d. 1 . Bonn ie. replied he would provide direction <br /> for the, grading, to be inspected by an engineer when <br /> completed. <br /> The Chairman insisted a comple:ion date for. the pond <br /> be established in order to insure completion of said <br /> basin-s . It was agreed the completion date is August 27'th <br /> (page of the checklist) "For the reconstruction of the <br /> man-made pore and landsc,apin.g shall be completed subject to <br /> ins'pection by the consulting Engineer. " <br /> The Town Planner noted landscaping for the entire <br /> project should be completed by theAugust 27tn date. He. <br /> them inquired if there is an exposed PVC liner at the edge <br /> f the pond. <br /> Mr. Bonvie explained a liner has been placed in-side <br /> the pond with a trench a-round the outside. The liner <br /> placed inside the trench is called a ley-, materials are <br /> placed on top, two to three inches of sand. The liner <br /> should not be noticeable along the maj orit-y cif the edge. <br /> There is a possibility of exposure due to wind and/or <br /> riprap. <br /> The Consulting Engineer suggested sod be placed around <br /> the inlet rather than leave- the loam and seed exposed. <br /> t this point the Chairman opened disc uszi n of the <br /> man ma-de pond to members of the Public, t_ecogni ing the <br /> following spea ers <br /> 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.