My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/19/2004 PLANNING BOARD Minutes
>
05/19/2004 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2022 5:16:35 PM
Creation date
1/19/2022 12:00:15 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
05/19/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mr . - onie has indicated an additional 1-- inch-es of <br /> pavement will be provided in order to compensate for the. <br /> lack of stone base. <br /> Public Heari-ng <br /> Windchime Point, Inc. - Windchirne Point Condominium <br /> Great Neck Road South - Approval of Modification <br /> To special Permit (Post office) <br /> The appointed hour having arrived the chairman ca-.11ed <br /> the Public Hearing to order. she then recognized Marty <br /> O' Malley,alle- , olunteer, Trustee and Chairperson of lindchime <br /> Condominium Trust. <br /> Mr. O'Malley clarified the Special Permit -hays been <br /> issued to Windchime Point, Developer . <br /> Nor. O'Malley informed the Board that he has met with <br /> Torn Quinn and John G ogliarda to discuss alternatives for <br /> the post office . <br /> As a point of clarification the "Town Planner noted the <br /> Applica-tion (Modification Notice) for the Post office is in <br /> the name of the Association, a.s. they are the landowners. <br /> Concept #1 - Would result in the loss of two parking <br /> spaces, with an additional five parking spaces on the other <br /> side. Mr. O' Malley explained an agreement has been reached <br /> with the Developer whereby the Association will sham <br /> costs, not to exceed Five Thou-sand . , oo . 00) Dollar:s . <br /> The Developer will be responsible for engineering costs; <br /> the- Association will be responsible for the Building <br /> Permit . The post office would accommodate 1 -boxes with <br /> some larger boxes for !oversized packages, etc. <br /> One-way cce s-s and egress, igage speed bumps would <br /> be necessary .. Traffic distribution -could be made both to <br /> the right and left . The du Aster would more than likely be <br /> relocated as well . <br /> Some small trees may have to be removed in order t <br /> enhance the line of vision. <br /> Lee Gurney inquired as to the status of the existing <br /> building. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.