My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/21/2004 PLANNING BOARD Minutes
>
07/21/2004 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2022 9:26:30 AM
Creation date
1/19/2022 12:06:28 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
07/21/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The Consulting Engineer has rude an inspection; <br /> construction is to be completed by August 27th. <br /> Masters Court has not been completed; the landscaper <br /> will be contacted and instructed to do so immediately. <br /> If certain roadways are currently in base coat, the <br /> parking wads are also in base coat Ironwood Path and <br /> Masters Court) . [upon completion of base coat to the <br /> parking pads and roadways, the road lines, -crossings, ,and <br /> visitor spaces will be marked. <br /> At this point Lee Gurney suggested construction <br /> sequences provided by the developer would be helpful when <br /> completion dates are set . <br /> It was agreed by the Board and developer that <br /> paving construction would be completed by October 15, 2004 . <br /> There has been interaction with the Consulting <br /> Engineer regarding reconstruction of pedestrian crosswalks <br /> o be in compliance with PTA standards . It was agreed this <br /> work would be completed by August 27 , 2004, the Town <br /> Planner to inspect the first week of September. <br /> The sidewalks along Longwood Toad and between Beacon <br /> Court and Unit 212 have been completed. The retaining wall <br /> has been prepped, not yet paved, the Consulting Engineer <br /> ha:s rude an inspection, construction should be completed <br /> tomorrow July 2 2nd . <br /> The Planner Board determined a completion date of <br /> August 27, 24 be imposed on all items- not yet completed. <br /> The sidewalk located at the Pine Hill Boulevard <br /> intersection has been corrected, inspected by the <br /> Consulting Engineer, and is ready for paving. The parking <br /> pad at - Longwood has been extended and is ready for <br /> paving . <br /> Developer requested a small retaining wall south of <br /> Beacon Court . <br /> MOTION : Dennis Bl arini made a Motion to approve <br /> construction of a retaining gall, to be identified on a <br /> revised plan, and referred to as D) of Merino dated July 15, <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.