My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/21/2004 PLANNING BOARD Minutes
>
07/21/2004 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2022 9:26:30 AM
Creation date
1/19/2022 12:06:28 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
07/21/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Said plan was approved in accordance. with the original <br /> Special Permit on a conceptual basis by the Zoning Board of <br /> Appeals on May 26, 2004; and has b .n filed with the <br /> Planning Board pursuant to the original. Special Permit and <br /> the joint Memorandum for consideration of approval this <br /> date. <br /> Building #1 7 and #188 have been roved slightly In an <br /> attempt. to preserve trees and improve, aesthetics. <br /> References were being made to the Layout Plan that sho r.s <br /> more detail regarding unit and road locati-ons... <br /> The Site Development Plan shows grading and utility <br /> details, as well as the proposed. location of snow fencing. <br /> The supplerftental Landscaping Plan include's a tree <br /> legend that designates all of the trees shown on the plan <br /> by variety. <br /> Plan L-1 identifies plant -type res-u-lting from <br /> conversations in the field with Town and owner <br /> representatives, as well. as the Southport Landscape <br /> Committee. <br /> The Chair- man requested Staff to comment . <br /> The Town Planner stated he has reviewed the plan and <br /> would like to make co=ents . He also provided a draft <br /> Decision to the Board. <br /> Comments have been made to the developer regarding the <br /> issue of saving trees/tree wells.. A sug.ge�stio.n had been <br /> made -that an arbor•ist -make an inspection prier to <br /> finalizing the plan so that these matters could be i <br /> identified and resolved on the plan. There is no, <br /> indication that this has- been done, the notation remains on <br /> the plan "Sage, if tree is healthy'" - <br /> Also, there are notations on the plan regarding <br /> sidewal ,and pedestrian crossings signs . Howeve-r, there <br /> are no sidewalks in this Section of the project. Said <br /> notations should be deleted for clarity. <br /> Tree clearing procedure-s noted the plan should also <br /> e deleted for clarity, as s specific set of trees has been <br /> identified and numbered on the revised pl-an. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.