My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/04/1999 PLANNING BOARD Minutes
>
08/04/1999 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2022 5:01:13 PM
Creation date
1/21/2022 10:55:11 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
08/04/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4 <br /> Motion seconded by Mr.Dennis Balzarini. <br /> Vote:Unanimous.4-0. <br /> PUBLIC HEARING <br /> APPLICANT CAPE COD HEALTH CARE 19 INC. <br /> ti`{;'' <br /> APPROVAL OF SPECIAL PERMIT FOR BUILDING <br /> .4 4' <br /> Chairman John Kuchinski excused himself from the meeting because of a conflict of interest <br /> with the Applicant. Vice Chairman Dennis Balzarini conducted the Public Hearing for Cape <br /> Cod Health Care,Inc. <br /> Vice Chairman Dennis Balzarini opened the Public Hearing for Cape Cod Health Care,Inc. <br /> at 7:37 P.M. <br /> Applicant: Cape Cod Health Care,Inc. <br /> Location: Mashpee Industrial Park <br /> A&sessors Map 88,Block 21 <br /> Request: Approval of Special Permit for 30,000 sq.& <br /> Professional/medical building. <br /> Continued from July 21,19990 <br /> lication for <br /> Mr.Pat Butler,representing Cape Cod Health Care,was present to review the app <br /> special permit to construct a 15,000 square foot footprint building consisting of two floors and <br /> a basement. <br /> IN <br /> Mr.Butler noted that at the time of the last hearing,there were seven items that the Planning IN.A -4 <br /> Board had requested additional information on. He stated that they will review those seven <br /> items at the meeting—he will be dealing with four of the items and Mr.Brian Dunn, ;.,.i� <br /> a <br /> Engineer with J.K.Holingren&Associates,will be dealing with the other three items. <br /> Mr.Butler noted the four items he would be reviewing for the Planning Board: <br /> • Summary of travel demand management mitigation that would be listed within the <br /> Development Agreement and how it would apply to this project. The Development <br /> Agreement being the Agreement between the Cape Cod Commission and the <br /> Mashpee Industrial Park. This lot is being sold by the Mashpee Industrial Park <br /> A K �;��.,y,, <br /> Trust to Falmouth Ho ?1.' ` �` <br /> spital and Cape Cod Health Care for the construction of this <br /> building. <br /> • Summary of traffic mitigation numbers and a discussion as to how the Development <br /> Agreement is going to deal with both on-site mitigation and off-site mitigation. <br /> • The report from the Design Review Committee. <br /> • The revised driveway location on the plan. <br /> tit <br /> Revised Drivewav Location <br /> 0$, <br /> : <br /> Mr.Butler presented the plan which shows the revised driveway location. j <br />
The URL can be used to link to this page
Your browser does not support the video tag.