My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/05/2003 PLANNING BOARD Minutes
>
02/05/2003 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2022 3:47:07 PM
Creation date
1/21/2022 11:12:43 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
02/05/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The Assistant Town Planner made the following <br /> suggestions to the Minutes of the November 20th Meeting <br /> Pg. 2, clarify "Trinity Place" no reference to Augat <br /> Building.; pg. 4..."and" proposed Echo Road site coverage; pg. <br /> 6, "is" free standing; pg. 2 , "modeled"; pg . 2.1, reference <br /> to Section E- ..pa'ge " . <br /> MOTION: Tennis Balarin-i. made a Motion to approve the <br /> Minutes of the November 20, 2:002 Meeting, as amended; which <br /> Motion was seconded by Don Myers and so voted unanimously. <br /> Public Hearing <br /> Windchime Paint, Inc. - Windchime Point Condominium <br /> Approval of Modification to Special Permit <br /> The appointed hour having arrived, the chairman called <br /> the Public Hearing in this matter to order. <br /> The Town Planner reported Torn Counsel has made a <br /> determination in this matter, definition of structures, a <br /> copy of which has been faxed to Attorney Taipale this date. <br /> The Chairman recognized Tom Quinn who presented a plan <br /> entitled, `Preliminary (in red) "Windchime Point Site Plan <br /> Phase III, dated February 5. 200 -C nits, 1 -Buildings" . <br /> (-Richard Term arrived at the Meeting at this point <br /> p.m. ) . <br /> Mr. Quinn explained some of the buildings along the <br /> back lot lime have been deleted. Buildings #26, 27, 2 , <br /> and 41 will be evenly spaced along the open space in the <br /> back. Minor adjustments have been made to Buildings #22, <br /> 2 , and 24 . Final engineering, topography is not yet ready <br /> for Mr. owl ey' s review. Some porches that are attached to <br /> the garages have been downsi ed; some of the garages have <br /> been redesigned to fit underneath the Buildings #4 , 47, <br /> 48, 49, and 50, as well as Buildings #.4 2 and 43 . The <br /> dr,ivewa-ys have not been laid out. <br /> Mr. Quinn provided the Board with an engineering <br /> report for the wastewater treatment plant. The Trustees <br /> have contracted a company to maintain grater quality <br /> reports . <br />
The URL can be used to link to this page
Your browser does not support the video tag.