Laserfiche WebLink
same horizontal wall plane, including wall indentations or protrusions and any wall planes which <br /> are visually substantially the same. <br /> The location of structures, building heights and setbacks between buildings shall require <br /> approval by the Fire Departrr ent with regard to emergency access and fire protection. In no <br /> case may one- or two-story pri ary structures be located less than twenty o feet from.each <br /> other or may structures containing more than two stories be located less than thirty o <br /> feet from any other habitable structure without specific approval from the Mashpee Fire.Chief. <br /> G. Phasing. <br /> In order to minimize dust, erosion and adverse impacts on adjoining.properties, phasing of any <br /> project involving a significant amount of clearing and earth moving is encouraged, and shall be <br /> required for projects involving clearing of more than 2 -acres. only one phase of such projects <br /> may be cleared at one time, and no clearing may commence on the nest phase until the Board <br /> has determined that the previous phase is substantially complete or has been sufficiently <br /> protected against erosion, the generation of dust or aesthetic or other impacts on abutting <br /> properties or on occupants of preceding project phases. <br /> Project phasing shall be designed so that: <br /> (1) temporary soil stockpiles and staging areas are located so as to prevent additional <br /> disturbance of soil or vegetation, . <br /> (2) utility construction is accommodated within each phase, <br /> (3) temporary turnarounds and emergency access are prodded a .each phase, <br /> (4) b th temporary and permanent stormwater management are addressed in each phase, <br /> (5) construction access 'is provided in each phase separate from aces from permanent <br /> occupants, <br /> (6) later upstream -phases address potential impacts to already completed "downstream" <br /> phases and <br /> (7) the sequence of construction of each phase and the entire project is clearly identified. <br /> o portion of the site shall be disturbed except for valid construction purposes consistent with <br /> the construction of project infrastructure and roadways or of buildings for which detailed site <br /> plans have been approved by the Board. The applicant shall install temporary landscape <br /> materials or other means of preventing erosion on any areas disturbed for more than four <br /> months 'but not yet developed with structures. A plan for said landscape materials or other <br /> means shall be presented to the Board for approval prior to installation, and installation shall be <br /> completed within sixty days of said approval. <br /> Sermon X <br /> PERFORMANCE GUARANTEES <br /> TEE <br /> Before approval of a special permit, the Board may require that a bond or other performance <br /> guarantee be filed by the applicant'in an amount determined by the Board to be sufficient t <br /> cover the cost of roadway improvements, parking areas, storm water management facilities, <br /> water quality monitoring programs, lndscaping or other items required by the Board's pewit <br /> decision, and approved as to form and sureties by the Town Treasurer, conditioned on the <br />