My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/17/2002 PLANNING BOARD Minutes
>
07/17/2002 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2022 11:01:29 AM
Creation date
1/25/2022 4:18:55 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
07/17/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Town of Mashpee g <br /> 4l-�Oi <br /> PCannin Board <br /> s�)� <br /> �W. 16 Great Neck Road North, Mashpee, MA 02649 <br /> Telephone (508)539-1400 ext. 520 • fax(508)539-1403 <br /> Mashpee Planning Board <br /> Certificate of Action <br /> July 24, 2002 <br /> To the Mashpee Town Clerk: <br /> This is to certify that the Masbpee Planning Board, at its meeting of July 17, 2002, has <br /> made its decision under the applicable Massachusetts statutes and Mashpee by-laws and <br /> regulations on the application of Paul J. Thomas, P.O. Box 2004, Cotuit, MA 02635 for <br /> approval of a Definitive Plan which was filed on June 19, 2002. <br /> The application has been approved with the following conditions: <br /> 1) The definitive plan shall properly address the comments of the Board's Consulting <br /> Engineer as contained in his letter to the Board dated June 5, 2002; <br /> 2) Any stumps or other unsuitable material present in the layout of proposed Miller Farm <br /> Road shall be removed and propsrly disposed before road construction to the satisfaction <br /> of the Board's Consulting Engineer; <br /> 3) Details of the typical section within drainage retention areas shown on sheet 3 shall be <br /> revised to reflect the addition of stone and dimensional details surrounding the drainage <br /> pipe, with said revisions to be submitted for review and approval by the Board's <br /> Consulting Engineer prior to endorsement of the definitive plan. <br /> 4) the applicant shall file a revised mylar and prints of the definitive plan sheet showing <br /> all abutters. <br /> You are hereby requested to retain this certificate and attachments pursuant to <br /> Massachusetts General Laws and to notify the Board if any appeal of this decision is <br /> made within the time period provided by law. <br /> `T&g �Gm� <br /> Onbehalf of the Mashpee Planning Board <br /> Received b the Town Clerk on aT �9 2ES�L <br /> own Clerk <br />
The URL can be used to link to this page
Your browser does not support the video tag.