Laserfiche WebLink
provided a completion date of July 20, 2002 .(4-years) . <br /> Development rights have expired, Mr. Bornstein is unable to <br /> continue development unless negotiations for an extension are <br /> reached with the property owners . <br /> The 1997 Modification of Special Permit provides a timetable <br /> for the phasing schedule which has also expired, requiring <br /> Modification ication the Permit in order to amend the phasing <br /> schedule. <br /> Counsel for the Cape Cod COMMiSBion CC has determined the <br /> single family subdivision project may go forward as proposed, and <br /> may be modified from the original permit without CCC review. <br /> However, the phasing schedule for the condominium units expired <br /> in 1990 and would require CCC review. (Said opinion to b <br /> provided in writing to the Town Planner. ) <br /> This- matter has been rescheduled for August 2 1, 2002 . <br /> (The Consulting Engineer arrived at the Meeting at this <br /> point, 7 : o p.m. ) <br /> Discussion <br /> Robert Goodman - west Way, Sandalwood Subdivision <br /> The Chairman recognized Tom McDonald, Sandlewood village <br /> Association, who explained the drainage problem. He made <br /> reference to the drainage easements, noting the pipes were to <br /> have run from the -street to the back of the lot. <br /> One of the problem lots/drainage has been satisfactorily <br /> resolved; the other would require disturbance of a coastal bank. <br /> References were being made to a plan entitled, "Subdivision <br /> Plan of Lard .in I ashpee, dated May 16, 1973, Lot 67,, by Hayes <br /> Engineering, Inc. " <br /> (Richard Terry arrived at the Meeting at this point, 7 : 12 <br /> P.M. ) <br /> It was determined that New Seabury, L.L.C. is the owner of <br /> the goad properties. Mr. McDonald asked for direction from the <br /> Board. <br /> Due to the fact the lots have been released, the Town <br /> Planner seers to feel the Planning Board has no authority in this <br /> matter and questioned the status of the inspectionmade -at the <br /> time of release of the covenant . This- is a legal matter to be ` <br /> determined by counsel between individual private owners of the <br /> properties and New Seabur , L.L.C. <br /> (Don Dyers arrived at the Meeting at this point, 7:20 p.m. <br /> -2- <br />