Laserfiche WebLink
Mr. Slavinsky explained all lots have 150 feet of frontage <br /> with the exception of Lot 6 which has been declared <br /> "Unbuildable" . Applicant is requesting a waiver of the $100 . o0 <br /> filing fee. <br /> It Was the consensus of the Board to deny request for waiver <br /> of said filing fees; Mir. Slavinsky thereupon paid $100 . 00 cash. <br /> MOTION: Dennis Bal arini made a Motion to approve signing <br /> of the ANR Plan as proposed; which motion Was seconded by Don <br /> Dyers and so voted unanimously. <br /> Covenant Release <br /> Gene smith - Roy Fagerberg <br /> The Town Planner explained the lot numbers on the Release <br /> form are incorrect from Assessors' Map) ; Applicant is requesting <br /> corrected Release form signed by the Board, for the same <br /> section of road. The security amount is $28, 000 . 00 . <br /> Applicant made reference to lots in question, # 4, #32, and <br /> #4 . He has obtained approval from the Water Department to <br /> connect four lots this year; and four next year. <br /> Dennis Bal arini informed Applicant of the undesirable <br /> condition of the site mud, dirt) ; and road damage due to <br /> excavation (septic) machinery. Also, roots, stumps and debris <br /> were being dumped onto the lot across the street. He suggested <br /> bales be installed to help correct the situation and prevent any <br /> further erosion damages; to which Applicant agreed. <br /> Applicant presented a corrected form of Release indicating <br /> the correct lot numbers, and adding one, noting the correction on <br /> the document. <br /> The Town Planner commented on the fact that Building PerxnLts <br /> have been issued without benefit of Covenant Release for the lots <br /> 4 . <br /> Dennis Bal arini again raised concern regarding the dumping <br /> of stumps onto Lot 5 . He cautioned Applicant to not cover therm <br /> over, but rather to have therm removed from the site. <br /> The Town Planner raised concerns with the condition of the <br /> circle, fearing it will -riot be cleaned-up if there is no security <br /> in place. He suggested Lot #50 not be released at this time to <br /> insure clean-up of the lot. <br /> The consulting Engineer stated security for these lots do <br /> not include any improvements to the circle. <br /> The chairman determined the consensus of the Board is t <br /> deny release for Lot #50 . <br />